Selecting Appropriate Project Delivery System: Fuzzy Approach with Risk Analysis

被引:63
作者
Mostafavi, Ali [3 ,4 ]
Karamouz, Mohammad [1 ,2 ]
机构
[1] NYU, Polytech Inst, Brooklyn, NY USA
[2] Univ Tehran, Sch Civil Engn, Tehran, Iran
[3] Purdue Univ, Sch Civil Engn, W Lafayette, IN 47907 USA
[4] Univ Tehran, Dept Civil Engn, Tehran, Iran
关键词
Project delivery systems; Fuzzy multiattribute decision making; Fuzzy TOPSIS; Risk attitude; Risk analysis;
D O I
10.1061/(ASCE)CO.1943-7862.0000190
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The selection of an appropriate project delivery system that suits all project and owner needs is one of the key decisions to a successful project. Therefore, this decision should be made based on thorough analysis. In this paper, a fuzzy multiattribute decision-making (FMADM) model is developed. The model accounts for uncertainties and imprecision in the decision space as well as fuzziness in the nature of the decision attributes. The model utilizes fuzzy decision-making approach in order to evaluate the membership function corresponding to the utility of each project delivery alternative. Project delivery system alternatives are ranked using fuzzy technique for order preference by similarity to ideal solution (TOPSIS) method based on their utility membership functions and by evaluating the distance of each project delivery alternative from fuzzy ideal solutions. In the TOPSIS method, alternatives are ranked based on their closeness coefficient (CC). In addition, the risk attitude of the decision maker is considered in the model by using derived utility membership functions corresponding to the risk attitude of the decision maker. The model is applied to a petrochemical project as a case study. In the case study, the model outcome that ranked Turnkey system as the best system conforms to the lessons learned by the decision maker from several past projects. Moreover, sensitivity analysis is done in the case study. The results show the significant value of the FMADM model for selecting appropriate project delivery system for projects.
引用
收藏
页码:923 / 930
页数:8
相关论文
共 50 条
  • [21] An improved fuzzy inference system-based risk analysis approach with application to automotive production line
    Hamzeh Soltanali
    Abbas Rohani
    Mohammad Tabasizadeh
    Mohammad Hossein Abbaspour-Fard
    Aditya Parida
    Neural Computing and Applications, 2020, 32 : 10573 - 10591
  • [22] A fuzzy outranking approach in risk analysis of web service security
    Ping Wang
    Kuo-Ming Chao
    Chi-Chun Lo
    Chun-Lung Huang
    Muhammad Younas
    Cluster Computing, 2007, 10 : 47 - 55
  • [23] A Fuzzy Accident Risk Analysis Approach for a Concurrent Engineering Platform
    Shahrokhi, Mahmoud
    Bernard, Alain
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, PT V, 2021, 634 : 351 - 360
  • [24] A New Approach of Ranking of Generalized Trapezoidal Fuzzy Numbers and Application in Fuzzy Risk Analysis
    Patra, Kartik
    CYBERNETICS AND SYSTEMS, 2024, 55 (05) : 1104 - 1128
  • [25] A fuzzy Bayesian network approach for risk analysis in process industries
    Yazdi, Mohammad
    Kabir, Sohag
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2017, 111 : 507 - 519
  • [26] A fuzzy outranking approach in risk analysis of web service security
    Wang, Ping
    Chao, Kuo-Ming
    Lo, Chi-Chun
    Huang, Chun-Lung
    Younas, Muhammad
    CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2007, 10 (01): : 47 - 55
  • [27] A risk analysis approach to selecting respiratory protection against airborne pathogens used for bioterrorism
    Nicas, M
    Hubbard, A
    AIHA JOURNAL, 2003, 64 (01): : 95 - 101
  • [28] System dynamics approach for construction risk analysis
    Nasirzadeh, Farnad
    Afshar, Abbas
    Khanzadi, Mostafa
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2008, 6 (02) : 120 - 131
  • [29] Project risk identification and analysis based on group decision making methodology in a fuzzy environment
    Makui, Ahmad
    Mojtahedi, S. Mohammad
    Mousavi, S. Meysam
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, 5 (02) : 108 - 118
  • [30] Generalized linear diophantine fuzzy Choquet integral with application to the project management and risk analysis
    Riaz, Muhammad
    Garg, Harish
    Hashmi, Masooma Raza
    Farid, Hafiz Muhammad Athar
    COMPUTATIONAL & APPLIED MATHEMATICS, 2023, 42 (06)