A population-based approach to the resource-constrained project scheduling problem

被引:66
作者
Valls, V
Ballestín, F
Quintanilla, S
机构
[1] Univ Valencia, Fac Matemat, Dpto Estadist & Invest Operat, E-46100 Valencia, Spain
[2] Univ Valencia, Fac Econ & Empresariales, Dpto Econ Financiera & Matemat, Valencia, Spain
关键词
population-based algorithms; scatter search; path relinking; hybrid heuristics; resource constrained project scheduling;
D O I
10.1023/B:ANOR.0000039524.09792.c9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We present a population-based approach to the RCPSP. The procedure has two phases. The first phase handles the initial construction of a population of schedules and these are then evolved until high quality solutions are obtained. The evolution of the population is driven by the alternative application of an efficient improving procedure for locally improving the use of resources, and a mechanism for combining schedules that blends scatter search and path relinking characteristics. The objective of the second phase is to explore in depth those vicinities near the high quality schedules. Computational experiments on the standard j120 set, generated using ProGen, show that our algorithm produces higher quality solutions than state-of-the-art heuristics for the RCPSP in an average time of less than five seconds.
引用
收藏
页码:305 / 324
页数:20
相关论文
共 50 条
  • [1] A Population-Based Approach to the Resource-Constrained Project Scheduling Problem
    Vicente Valls
    Francisco Ballestín
    Sacramento Quintanilla
    Annals of Operations Research, 2004, 131 : 305 - 324
  • [2] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [3] Hybrid Heuristics for Dynamic Resource-Constrained Project Scheduling Problem
    Villela da Silva, Andre Renato
    Ochi, Luiz Satoru
    HYBRID METAHEURISTICS, 2010, 6373 : 73 - 87
  • [4] A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
    Pellerin, Robert
    Perrier, Nathalie
    Berthaut, Francois
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 280 (02) : 395 - 416
  • [5] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335
  • [6] Scheduling resource-constrained project problem with alternative activity chains
    Tao, Sha
    Dong, Zhijie Sasha
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 114 : 288 - 296
  • [7] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [8] A competitive Genetic Algorithm for resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 2945 - 2949
  • [9] An estimation of distribution algorithm for resource-constrained project scheduling problem
    Fang, Chen
    Wang, Ling
    Xu, Ye
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 265 - 270
  • [10] An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem
    Huang, Zhiyu
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 8292 - 8297