Self-Remanufacturing or Outsourcing? Hybrid Manufacturing System With Remanufacturing Options Under Yield Uncertainty

被引:3
作者
Wang, Miaomiao [1 ]
Tian, Tao [1 ]
Zhu, Xiaoxi [2 ,3 ]
机构
[1] Anhui Agr Univ, Coll Econ & Management, Hefei 230036, Anhui, Peoples R China
[2] Hefei Univ Technol, Sch Management, Hefei 230009, Anhui, Peoples R China
[3] Hefei Univ Technol, Minist Educ, Key Lab Proc Optimizat & Intelligent Decis Making, Hefei 230009, Anhui, Peoples R China
基金
中国国家自然科学基金;
关键词
Uncertainty; Supply chains; Procurement; Outsourcing; Pricing; Stochastic processes; Remanufacturing; outsourcing; recovery rate; yield uncertainty; SUPPLY CHAIN; INVENTORY MODEL; PRODUCTION DECISIONS; PROCUREMENT; COMPETITION; STRATEGIES; CAPACITY; QUALITY; DEMAND; IMPROVEMENT;
D O I
10.1109/ACCESS.2019.2947702
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Yield uncertainty widely exists in manufacturing industries. Because of the particularities of the recovery and production processes, remanufacturing is seriously affected by the uncertainty of the production process, which also affects the remanufacturing choice of enterprises. In this paper, we focus on the case where a make-to-order type manufacturer is confronted with the strategic option of obtaining core materials by self-remanufacturing or outsourcing new cores. Through a stochastic modelling approach, a two-echelon closed-loop supply chain is constructed to capture the manufacturers sourcing strategy and production planning by considering yield uncertainty in both the remanufacturing and production stages. We first examine the case of a deterministic recovery rate. The results show that regardless of whether the firm chooses to remanufacture or buy new core materials, the expected profit of the (re)manufacturer is always concave. Then, in the case of a random recovery rate, we show that the distribution bounds are important and play key roles in deciding the strategic option of self-remanufacturing or outsourcing. By comparing the upper and lower bounds of the recovery rate with the procurement cost of new raw material and used product, three production/sourcing strategies, namely, using remanufactured cores only, outsourcing new material only and jointly using the two materials, are investigated. The optimal procurement quantity and the optimal production input are derived to maximize the (re)manufacturers expected profits under the three scenarios. Finally, we perform sensitivity analysis of the impact of yield uncertainty on the optimal results. The results show that when the shortage cost increases, the collection quantity increases faster than the production input, which implies that a bullwhip effect exists in the proposed two-period collection and production system. The conclusions of this paper can be applied to remanufacturing in related enterprises to provide production and procurement decision support for managers and to promote the efficiency of closed-loop supply chains.
引用
收藏
页码:150642 / 150656
页数:15
相关论文
共 53 条
[1]   Remanufacturing, Third-Party Competition, and Consumers' Perceived Value of New Products [J].
Agrawal, Vishal V. ;
Atasu, Atalay ;
van Ittersum, Koert .
MANAGEMENT SCIENCE, 2015, 61 (01) :60-72
[2]   Competition and diversification effects in supply chains with supplier default risk [J].
Babich, Volodymyr ;
Burnetas, Apostolos N. ;
Ritchken, Peter H. .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2007, 9 (02) :123-146
[3]  
Bakal IS, 2006, PROD OPER MANAG, V15, P407, DOI 10.1111/j.1937-5956.2006.tb00254.x
[4]   Competition for cores in remanufacturing [J].
Bulmus, Serra Caner ;
Zhu, Stuart X. ;
Teunter, Ruud .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 233 (01) :105-113
[5]   Coordinating VMI supply chain under yield uncertainty: Option contract, subsidy contract, and replenishment tactic [J].
Cai, Jianhu ;
Zhong, Man ;
Shang, Jennifer ;
Huang, Weilai .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2017, 185 :196-210
[6]   Vendor-buyer inventory problem revisited: modeling random yield and trade credit [J].
Cetinkaya, S. ;
Zhang, Y. ;
Akcali, E. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2017, 68 (10) :1265-1278
[7]   A newsvendor's procurement problem when suppliers are unreliable [J].
Dada, Maqbool ;
Petruzzi, Nicholas C. ;
Schwarz, Leroy B. .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2007, 9 (01) :9-32
[8]   Determining Replenishment Lot Size and Shipment Policy for an EPQ Inventory Model with Delivery and Rework [J].
Eduardo Cardenas-Barron, Leopoldo ;
Trevino-Garza, Gerardo ;
Taleizadeh, Ata Allah ;
Vasant, Pandian .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
[9]  
GIOVANNI PD, 2014, EUR J OPER RES, V232, P22, DOI [DOI 10.1016/J.EJ0R.2013.06.032, DOI 10.1016/j.ejor.2013.06.032]
[10]   Multiple lotsizing in production to order with random yields: Review of recent advances [J].
Grosfeld-Nir, A ;
Gerchak, Y .
ANNALS OF OPERATIONS RESEARCH, 2004, 126 (1-4) :43-69