Adaptive sequential preventive maintenance policy and Bayesian consideration

被引:0
|
作者
Kim, Hee Soo
Kwon, Young Sub
Park, Dong Ho [1 ]
机构
[1] Hallym Univ, Dept Informat & Stat, Chunchon 200702, South Korea
[2] Chosun Univ, Sch Aerosp & Naval Architecture, Kwangju 501759, South Korea
基金
新加坡国家研究基金会;
关键词
adaptive method; Bayesian approach; cost rate; hazard rate; improvement factor; minimal repair; sequential PM;
D O I
10.1080/03610920601076537
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
This article proposes an adaptive sequential preventive maintenance (PM) policy for which an improvement factor is newly introduced to measure the PM effect at each PM. For this model, the PM actions are conducted at different time intervals so that an adaptive method needs to be utilized to determine the optimal PM times minimizing the expected cost rate per unit time. At each PM, the hazard rate is reduced by an amount affected by the improvement factor which depends on the number of PM's preceding the current one. We derive mathematical formulas to evaluate the expected cost rate per unit time by incorporating the PM cost, repair cost, and replacement cost. Assuming that the failure times follow a Weibull distribution, we propose an optimal sequential PM policy by minimizing the expected cost rate. Furthermore, we consider Bayesian aspects for the sequential PM policy to discuss its optimality. The effect of some parameters and the functional forms of improvement factor on the optimal PM policy is measured numerically by sensibility analysis and some numerical examples are presented for illustrative purposes.
引用
收藏
页码:1251 / 1269
页数:19
相关论文
共 50 条
  • [21] Sequential Preventive Maintenance Strategy Considering Difference of Maintenance Effect
    Li X.
    Ran Y.
    Zhang G.
    He Y.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2023, 57 (11): : 1522 - 1530
  • [22] Modelling and optimizing sequential imperfect preventive maintenance
    Bartholomew-Biggs, Michael
    Zuo, Ming J.
    Li, Xiaohu
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2009, 94 (01) : 53 - 62
  • [23] A GENERALIZED SEQUENTIAL PREVENTIVE MAINTENANCE POLICY FOR REPAIRABLE SYSTEMS WITH GENERAL RANDOM MINIMAL REPAIR COSTS
    SHEU, SH
    LIOU, CT
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1995, 26 (03) : 681 - 690
  • [24] Flexible job shop scheduling with preventive maintenance consideration
    Wocker, Michael Mario
    Ostermeier, Frederik Ferid
    Wanninger, Tobias
    Zwinkau, Ronny
    Deuse, Jochen
    JOURNAL OF INTELLIGENT MANUFACTURING, 2024, 35 (04) : 1517 - 1539
  • [25] ALGORITHM FOR PREVENTIVE MAINTENANCE POLICY.
    Lie, Chang Hoon
    Chun, Young Ho
    IEEE Transactions on Reliability, 1986, R-35 (01) : 71 - 75
  • [26] Flexible job shop scheduling with preventive maintenance consideration
    Michael Mario Wocker
    Frederik Ferid Ostermeier
    Tobias Wanninger
    Ronny Zwinkau
    Jochen Deuse
    Journal of Intelligent Manufacturing, 2024, 35 : 1517 - 1539
  • [27] Suggested procedure for preventive maintenance policy
    ElDamcese, MA
    MICROELECTRONICS AND RELIABILITY, 1997, 37 (08): : 1173 - 1177
  • [28] PREVENTIVE-MAINTENANCE POLICY SELECTION
    PARSONS, JA
    JOURNAL OF INDUSTRIAL ENGINEERING, 1965, 16 (05): : 321 - &
  • [29] PERIODIC INSPECTION POLICY WITH PREVENTIVE MAINTENANCE
    NAKAGAWA, T
    NAVAL RESEARCH LOGISTICS, 1984, 31 (01) : 33 - 40
  • [30] Optimal preventive maintenance policy with policy of production wait
    Wang W.-B.
    Li P.
    Peng R.
    Journal of Shanghai Jiaotong University (Science), 2015, 20 (03) : 322 - 325