Comparisons of metaheuristic algorithms for unrelated parallel machine weighted earliness/tardiness scheduling problems

被引:12
作者
Arik, Oguzhan Ahmet [1 ]
机构
[1] Nuh Naci Yazgan Univ, Dept Ind Engn, TR-38170 Kayseri, Turkey
关键词
Artificial bee colony; Genetic algorithm; Simulated annealing; Earliness; tardiness; Parallel machine; Scheduling; COMMON DUE-DATE; TARDINESS; EARLINESS; ASSIGNMENT; HEURISTICS; COSTS;
D O I
10.1007/s12065-019-00305-7
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper investigates unrelated parallel machine scheduling problems where the objectives are to minimize total weighted sum of earliness/tardiness costs. Three different metaheuristic algorithms are compared with others to determine what kind (swarm intelligence based, evolutionary or single solution) of metaheuristics is effective to solve these problems. In this study, artificial bee colony (ABC), genetic algorithm and simulated annealing algorithm are chosen as swarm intelligence based algorithm, evolutionary algorithm and single solution algorithm. All proposed algorithms are created without modification in order to determine effectiveness of these metaheuristics. Experimental results show that ABC outperforms its opponents in view of solution quality as swarm intelligence based metaheuristic algorithm.
引用
收藏
页码:415 / 425
页数:11
相关论文
共 20 条
[1]   Scheduling under a common due-date on parallel unrelated machines [J].
Adamopoulos, GI ;
Pappis, CP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 105 (03) :494-501
[2]   Common Due-Date Problem: Exact Polynomial Algorithms for a Given Job Sequence [J].
Awasthi, Abhishek ;
Laessig, Joerg ;
Kramer, Oliver .
2013 15TH INTERNATIONAL SYMPOSIUM ON SYMBOLIC AND NUMERIC ALGORITHMS FOR SCIENTIFIC COMPUTING (SYNASC 2013), 2014, :258-264
[3]   Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties [J].
Bank, J ;
Werner, F .
MATHEMATICAL AND COMPUTER MODELLING, 2001, 33 (4-5) :363-383
[4]   On the quadratic model for unrelated parallel machine scheduling problem with restrictive common due date [J].
Beyranvand, M. S. ;
Peyghami, M. Reza ;
Ghatee, M. .
OPTIMIZATION LETTERS, 2012, 6 (08) :1897-1911
[5]   Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs [J].
Drobouchevitch, Inna G. ;
Sidney, Jeffrey B. .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (09) :1919-1926
[6]   Deluge based Genetic Algorithm for feature selection [J].
Guha, Ritam ;
Ghosh, Manosij ;
Kapri, Souvik ;
Shaw, Sushant ;
Mutsuddi, Shyok ;
Bhateja, Vikrant ;
Sarkar, Ram .
EVOLUTIONARY INTELLIGENCE, 2021, 14 (02) :357-367
[7]   Chemical reaction optimization: survey on variants [J].
Islam, Md. Rafiqul ;
Saifullah, C. M. Khaled ;
Mahmud, Md. Riaz .
EVOLUTIONARY INTELLIGENCE, 2019, 12 (03) :395-420
[8]  
Karaboga D., 2005, An idea based on honey bee swarm for numerical optimization
[9]   Fast and meta-heuristics for common due-date assignment and scheduling on parallel machines [J].
Kim, Jun-Gyu ;
Kim, Ji-Su ;
Lee, Dong-Ho .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) :6040-6057
[10]   Minimising total weighted earliness and tardiness penalties on identical parallel machines using a fast ruin-and-recreate algorithm [J].
Lin, Shih-Wei ;
Ying, Kuo-Ching ;
Chiang, Yen-I ;
Wu, Wen-Jie .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (22) :6879-6890