Disassembly scheduling with multiple product types

被引:47
作者
Kim, HJ [1 ]
Lee, DH
Xirouchakis, P
Züst, R
机构
[1] Swiss Fed Inst Technol, Lab Comp Aided Design & Prod, LICP, Inst Prod Res,EPFL, CH-1015 Lausanne, Switzerland
[2] Hanyang Univ, Dept Ind Engn, Seoul 133791, South Korea
[3] Swiss Fed Inst Technol, ETH Ags, Ctr Sustainabil ETH, ETHZ, Zurich, Switzerland
来源
CIRP ANNALS-MANUFACTURING TECHNOLOGY | 2003年 / 52卷 / 01期
关键词
disassembly; production planning and scheduling; optimization;
D O I
10.1016/S0007-8506(07)60611-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the problem of determining the disassembly schedules of used products while satisfying the demand of their parts/components over a planning horizon. The case of multiple product types with parts commonality is considered for the objective of minimizing the sum of setup, disassembly operation, and inventory holding costs, A heuristic algorithm is proposed using the linear programming relaxation approach Test results of the case study on the data obtained from a disassembly shop show that the heuristic algorithm suggested in this paper works well for practical problems.
引用
收藏
页码:403 / 406
页数:4
相关论文
共 10 条
  • [1] SCHEDULING DISASSEMBLY
    GUPTA, SM
    TALEB, KN
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) : 1857 - 1866
  • [2] Jovane F., 1993, ANN CIRP, V42, P651, DOI DOI 10.1016/S0007-8506(07)62530-X
  • [3] Disassembly scheduling with capacity constraints
    Lee, DH
    Xirouchakis, P
    Zust, R
    [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2002, 51 (01) : 387 - 390
  • [4] Disassembly planning and scheduling: review and further research
    Lee, DH
    Kang, JG
    Xirouchakis, P
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2001, 215 (05) : 695 - 709
  • [5] LEE DH, 2002, DISASSEMBLY SCHEDULI
  • [6] Neuendorf KP, 2001, FUND INFORM, V47, P295
  • [7] State of the art literature survey on disassembly planning
    O'Shea, B
    Grewal, SS
    Kaebernick, H
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1998, 6 (04): : 345 - 357
  • [8] SANTOCHI M, 2002, ANN CIRP, V51, P1
  • [9] Disassembly of complex product structures with parts and materials commonality
    Taleb, KN
    Gupta, SM
    Brennan, L
    [J]. PRODUCTION PLANNING & CONTROL, 1997, 8 (03) : 255 - 269
  • [10] Disassembly of multiple product structures
    Taleb, KN
    Gupta, SM
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (04) : 949 - 961