Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea

被引:131
作者
Won, Jongsung [1 ]
Cheng, Jack C. P. [1 ]
Lee, Ghang [2 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Hong Kong, Hong Kong, Peoples R China
[2] Yonsei Univ, Dept Architectural Engn, Seoul 120749, South Korea
关键词
Construction waste; Building information modeling (BIM); BIM-based design validation; Quantification; Prevention; Likelihood; LEAN CONSTRUCTION; SUSTAINABILITY; REDUCTION;
D O I
10.1016/j.wasman.2015.12.026
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Waste generated in construction and demolition processes comprised around 50% of the solid waste in South Korea in 2013. Many cases show that design validation based on building information modeling (BIM) is an effective means to reduce the amount of construction waste since construction waste is mainly generated due to improper design and unexpected changes in the design and construction phases. However, the amount of construction waste that could be avoided by adopting BIM-based design validation has been unknown. This paper aims to estimate the amount of construction waste prevented by a BIM-based design validation process based on the amount of construction waste that might be generated due to design errors. Two project cases in South Korea were studied in this paper, with 381 and 136 design errors detected, respectively during the BIM-based design validation. Each design error was categorized according to its cause and the likelihood of detection before construction. The case studies show that BIM-based design validation could prevent 4.3-15.2% of construction waste that might have been generated without using BIM. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:170 / 180
页数:11
相关论文
共 37 条
[1]  
Ahankoob Alireza., 2012, BIM PERSPECTIVES ON CONSTRUCTION WASTE REDUCTION, P195
[2]  
Andalusian Government - Dwelling Counseling, 2010, AND CONSTR COSTS DAT
[3]  
[Anonymous], 2013 GEN DISP WAST S
[4]  
[Anonymous], 2012, P 2 INT C MANAGEMENT
[5]  
[Anonymous], 2004, P MIN CONSTR WAST C
[6]  
[Anonymous], STUDY EFFECT PREDETE
[7]  
Anumba C., 2010, The BIM project execution planning guide and templates-version 2.0
[8]  
유용신, 2012, [Journal of the Architectural Institute of Korea Structure & Construction, 대한건축학회논문집 구조계], V28, P127
[9]  
Cheng J.C., 2015, 23 ANN C INT GROUP L
[10]   A BIM-based system for demolition and renovation waste estimation and planning [J].
Cheng, Jack C. P. ;
Ma, Lauren Y. H. .
WASTE MANAGEMENT, 2013, 33 (06) :1539-1551