Action-based union of the temporal opposites in scheduling: non-deterministic approach

被引:3
作者
Yagi, J
Arai, E
Shirase, K
Matsumoto, S
机构
[1] Shimizu Corp, Inst Technol, Minato 1058007, Japan
[2] Osaka Univ, Osaka, Japan
[3] CSP Japan, Tokyo, Japan
关键词
union of opposites; internal and external order of time; initial and final conditions; dichotomy; temporal symmetry and asymmetry; certainty and uncertainty; entropy;
D O I
10.1016/S0926-5805(02)00107-3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
It is the time resource that one deals with in scheduling. The task is how one can achieve the optimal allocation of a given time resource over a set of assigned activities. Most of the existing scheduling methods use a parametric time by which the activities are orderly allocated in accordance with the order of events. The parametric methods, however, fail in incorporating a dynamic aspect of scheduling that unfolds itself as the project proceeds, and also uncertainty that the starting and ending nodes of an activity fluctuate. This paper reformulates the concept of time to match to a dynamic scheduling through a non-deterministic approach. In particular, time can be regarded as an object in the holographic space, which models the dynamic aspects of time as a "mapped/represented" and "transformed/processed" temporal movement. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:321 / 329
页数:9
相关论文
共 14 条
[1]  
HARRISON ER, 1995, Q J ROY ASTRON SOC, V36, P193
[2]  
HILLY BJ, 1991, QUANTUM IMPLICATIONS
[3]  
HOFSTADTER RD, 1979, GODEL ESCHER BACH BA
[4]  
KANO N, 1995, CONSTRUCTION PROCESS
[5]  
KELLY KE, 1959, P E JOINT COMP C BOS
[6]  
MATSUMOTO S, 1987, OPER RES JPN, V32, P722
[7]   MODIFIED PERT VERSUS FRACTILE ASSESSMENT OF SUBJECTIVE-PROBABILITY DISTRIBUTIONS [J].
MOSKOWITZ, H ;
BULLERS, WI .
ORGANIZATIONAL BEHAVIOR AND HUMAN PERFORMANCE, 1979, 24 (02) :167-194
[8]  
NAGAOKA K, 1997, PROCESS PLAN MANAGEM, V492
[9]  
POPESCU C, 1975, P AM SOC CIV ENG J, V101, P769
[10]  
Prigogine I., 1980, BEING BECOMING