Communication Requirements for Optimal Utilization of LV Power Distribution Systems

被引:0
作者
Kuladinithi, Koojana [1 ]
Fielitz, Helge [2 ]
Muehleisen, Maciej [1 ]
Becker, Christian [2 ]
Timm-Giel, Andreas [1 ]
机构
[1] Hamburg Univ Technol, Inst Commun Networks, D-21071 Hamburg, Germany
[2] Hamburg Univ Technol, Inst Elect Power & Energy Technol IEET, D-21071 Hamburg, Germany
来源
MOBILE NETWORKS AND MANAGEMENT (MONAMI 2016) | 2017年 / 191卷
关键词
CPN; LV power grid; Latency with ultra low jitter; Reliability; Time synchronisation; Communication networks;
D O I
10.1007/978-3-319-52712-3_8
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Decentralised electric power generation using renewable energy sources are becoming increasingly popular. As a consequence, decentralised electrical energy sources such as photovoltaic (PV) are connected to the low voltage (LV) power grids. This raises the requirement of dedicated and coordinated control of loads and power generation to realize intelligent power management in order to guarantee the full use of the available power transmission capacity. In this paper, we have analyzed the communication requirements when coupling a communication network with the LV power grid to enhance the maximum utilization of the existing physical resources. This paper identifies the exact communication requirements needed in enhancing the utilization of the LV power grid. There are, mainly two requirements: Firstly, the necessity of a fast reaction time in the range of 10 ms up to 300 ms, when the power system operates closer to its maximum utilization. Secondly, the necessity of a very low synchronisation time that should be less than 5.6 mu s (required for the phasor measurements). We further discuss the usability of existing communication technologies and architectures for the discussed scenario.
引用
收藏
页码:102 / 115
页数:14
相关论文
共 19 条
[1]  
Abad F. A. T., 2012, IEEE INT C EMB REAL
[2]   The role of communication systems in smart grids: Architectures, technical solutions and research challenges [J].
Ancillotti, Emilio ;
Bruno, Raffaele ;
Conti, Marco .
COMPUTER COMMUNICATIONS, 2013, 36 (17-18) :1665-1697
[3]  
[Anonymous], 2009, P 5 INT C EM NETW EX, DOI [DOI 10.1145/1658939.1658941, 10.1145/1658939.1658941]
[4]  
[Anonymous], INFORM CENTRIC NETWO
[5]  
[Anonymous], NEPL PLANN OPT EL GA
[6]  
Dannewitz C., 2009, P 3R GI ITG KUVS WOR
[7]  
Hagerling C., 2014, IEEE SMARTGRID COMM
[8]  
Heuck K., 2013, ELEKT ENERGIEVERSORG, V9
[9]  
Huang Y.F., 2012, IEEE SIGNAL PROCESSI
[10]   Co-simulation platforms for co-design of networked control systems: An overview [J].
Li, Weilin ;
Zhang, Xiaobin ;
Li, Huimin .
CONTROL ENGINEERING PRACTICE, 2014, 23 :44-56