共 44 条
- [1] Al-Hassan S., 2007, GHANA MINING J, V9, DOI [10.4314/gm.v9i1.42606, DOI 10.4314/GM.V9I1.42606]
- [2] Alarie S., 2002, INT J SURFACE MINING, V16, P59, DOI [10.1076/ijsm.16.1.59.3408, DOI 10.1076/IJSM.16.1.59.3408]
- [3] EXPERT SYSTEM FOR EQUIPMENT SELECTION FOR EARTH-MOVING OPERATIONS [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (02): : 318 - 331
- [4] Ataeepour N., 1999, International Journal of Surface Mining, Reclamation and Environment, V13, P125, DOI DOI 10.1080/09208119908944228
- [5] Predicting equipment requirements using SIMAN simulation - a case study [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2003, 112 : 180 - 184
- [6] Bandopadhyay, 2002, INT J SURF MIN RECLA, V16, P163, DOI [10.1076/ijsm.16.3.163.7420, DOI 10.1076/IJSM.16.3.163.7420]
- [7] An application of the analytic hierarchy process in equipment selection at Orhaneli open pit coal mine [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2004, 113 (03): : 192 - 199
- [9] Sizing equipment for open pit mining - a review of critical parameters [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2003, 112 : 171 - 179
- [10] Burt C., 2008, OPTIMISATION APPROAC