Efficient Constructive procedures for the distributed blocking flow shop scheduling problem

被引:0
作者
Companys, Ramon [1 ]
Ribas, Imma [1 ]
机构
[1] Univ Politecn Cataluna, BarcelonaTech, Dept Org Empreses, Barcelona, Spain
来源
2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM) | 2015年
关键词
distributed blocking flow shop; blocking flow shop; distributed permutation flow shop; constructive heuristics; SEARCH ALGORITHM; MAKESPAN; TIME;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
the distributed blocking flow shop scheduling problem (DBFSP) allows modeling of the scheduling process in companies with more than one factory, with productive systems configured as flow shop lines where the blocking constraint has to be considered. To the best of our knowledge, this variant of the distributed permutation flow shop scheduling problem has not been studied. In this paper, we propose some constructive heuristics that will solve the DBFSP and thus minimize the maximum completion time among the factories. The proposed procedures use two approaches that are totally different from those proposed for the distributed permutation flow shop scheduling problem (DPFSP). By taking the DPFSP procedures that we adapted to DBFSP and comparing them to the new approaches that were specifically designed for DBPFSP, we find that the latter perform considerably better.
引用
收藏
页码:92 / 98
页数:7
相关论文
共 23 条
[1]  
[Anonymous], 1966, ESTUDIOS EMPRESARIAL
[2]  
Behnamian J., 2014, J INTELL MANUF, P1
[3]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[4]   A bounded-search iterated greedy algorithm for the distributed permutation flowshop scheduling problem [J].
Fernandez-Viagas, Victor ;
Framinan, Jose M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) :1111-1123
[5]  
GAO J., 2012, International journal of advancements in computing technology, V4, P121
[6]  
Gao J., 2012, Journal of Computational Information Systems, V8, P2025
[7]  
Gao J., 2012, HYBRID GENETIC ALGOR
[8]   An efficient tabu search algorithm for the distributed permutation flowshop scheduling problem [J].
Gao, Jian ;
Chen, Rong ;
Deng, Wu .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (03) :641-651
[9]  
GONG H, 2010, DISRUPT MANAG, V37, P960, DOI DOI 10.1016/J.COR.2009.08.001
[10]  
Hongcheng Liu, 2010, Proceedings 2010 Sixth International Conference on Manufacturing Automation (ICMA 2010), P156, DOI 10.1109/ICMA.2010.17