共 50 条
- [42] Performance improvement by integrating preventive maintenance and production scheduling for a two-machine flow shop Journal of Quality, 2013, 19 (03): : 241 - 263
- [44] Heuristics for a Two-Stage Assembly-Type Flow Shop with Limited Waiting Time Constraints APPLIED SCIENCES-BASEL, 2021, 11 (23):