Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines

被引:17
作者
Zhang, Zikai [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment & Control Technol, Minist Educ, Wuhan, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Multiple assembly machines; Assembly flow shop; Preventive maintenance; Heuristics; Meta-heuristic; ITERATED GREEDY ALGORITHM; ARTIFICIAL BEE COLONY; SETUP TIMES; TARDINESS; MAKESPAN; MINIMIZATION; SYSTEM; COSTS;
D O I
10.1016/j.cie.2021.107493
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where m1 dedicated machines in fabrication stage and m2 machines in assembly stage. Each machine is given a new feature maintenance level, whose initial value is determined based on the Weibull probability distribution. To ensure the machines' reliability and production continuity, we need to find a fit product sequence along with PM execution time points. Hence this paper tries to tackle this new integration problem by a mixed integer linear programming model, two heuristics MCMTPM and NEHPM, and a PM-based iterated greedy algorithm (IGPM). IGPM is embedded with a problem-specific solution evaluation and two types of local search methods. The final experimental results show that compared with the other 9 state-of-the-art methods, the proposed IGPM embedded with NEHPM and reference local search generates the best results in all benchmark instances.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] A discrete PSO for two-stage assembly scheduling problem
    Tian, Ye
    Liu, Dayou
    Yuan, Donghui
    Wang, Kunhao
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (1-4) : 481 - 499
  • [32] The two stage assembly flow-shop scheduling problem with batching and delivery
    Kazemi, Hamed
    Mazdeh, Mohammad Mahdavi
    Rostami, Mohammad
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 63 : 98 - 107
  • [33] Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints
    Munoz-Sanchez, Rafael
    Martinez-Salazar, Iris
    Luis Gonzalez-Velarde, Jose
    Rios Solis, Yasmin A.
    PLOS ONE, 2024, 19 (06):
  • [34] Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production
    Huang, Rong-Hwa
    Yu, Shun-Chi
    JOURNAL OF CLEANER PRODUCTION, 2016, 135 : 276 - 283
  • [35] Metaheuristics for Two-stage No-Wait Flexible Flow Shop Scheduling Problem
    Ghaleb, Mageed A.
    Suryahatmaja, Umar S.
    Alharkan, Ibrahim M.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [36] A two-stage integrating optimization of production scheduling, maintenance and quality
    Zheng, Jiafei
    Yang, Hongbing
    Wu, Qingsong
    Wang, Ziyang
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2020, 234 (11) : 1448 - 1459
  • [37] Bi-level genetic algorithms for a two-stage assembly flow-shop scheduling problem with batch delivery system
    Basir, Saeedeh Ahmadi
    Mazdeh, Mohammad Mandavi
    Namakshenas, Mohammad
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 : 217 - 231
  • [38] Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem
    Zheng, Shuang
    He, Zhengwen
    Yang, Zhen
    Chu, Chengbin
    Wang, Nengmin
    COMPUTERS & OPERATIONS RESEARCH, 2023, 153
  • [39] Robust scheduling for a two-stage assembly shop with scenario-dependent processing times
    Wu, Chin-Chia
    Gupta, Jatinder N. D.
    Cheng, Shuenn-Ren
    Lin, Bertrand M. T.
    Yip, Siu-Hung
    Lin, Win-Chin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (17) : 5372 - 5387
  • [40] Minimising makespan in the two-stage assembly hybrid flow shop scheduling problem using artificial immune systems
    Komaki, G. M.
    Teymourian, Ehsan
    Kayvanfar, Vahid
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (04) : 963 - 983