A Solution to the Problem of Electrical Load Shedding Using Hybrid PV/Battery/Grid-Connected System: The Case of Households' Energy Supply of the Northern Part of Cameroon

被引:17
作者
Falama, Ruben Zieba [1 ,2 ]
Welaji, Felix Ngangoum [2 ]
Dadje, Abdouramani [3 ]
Dumbrava, Virgil [4 ]
Djongyang, Noel [5 ]
Ben Salah, Chokri [6 ]
Doka, Serge Yamigno [7 ]
机构
[1] Univ Maroua, Fac Mines & Petr Ind, POB 46, Maroua, Cameroon
[2] Inst Geol & Min Res, Lab Energy Res, POB 4110, Yaounde, Cameroon
[3] Univ Ngaoundere, Sch Geol & Min Engn, POB 454, Ngaoundere, Cameroon
[4] Univ Politehn Bucuresti, Fac Power Engn, Dept Power Syst, Splaiul Independentei 313,Dist 6, Bucharest 060042, Romania
[5] Univ Maroua, Natl Adv Polytech Sch, Dept Renewable Energy, POB 46, Maroua, Cameroon
[6] Univ Sousse, Dept Elect Engn, LASEE Lab, ENIM,ISSAT Sousse, Monastir, Tunisia
[7] Univ Ngaoundere, Fac Sci, POB 454, Ngaoundere, Cameroon
关键词
techno-economic study; optimal design; FA; investment cost; LPSP; OPTIMAL OPERATION; MANAGEMENT; DIESEL; SOLAR; OPTIMIZATION; TECHNOLOGY; BLACKOUTS; IMPACTS;
D O I
10.3390/en14102836
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A techno-economic study of a hybrid PV/Battery/Grid-connected system for energy supply is carried out in this paper to respond to the problem of electrical load shedding. An optimal design of the system is realized thanks to a double-objective optimization based on a proposed operational strategy of the system and on Firefly Algorithm (FA). The system is designed for household energy supply in three different towns of the northern part of Cameroon. For different LPSP (Loss of Power Supply Probability), the double objective simulation determines the optimal configurations of the system with their related cost. The optimal and reliable PV/Battery subsystem configuration corresponding to LPSP of 0% obtained for one household is composed for the towns of Maroua and Garoua by 8 PV modules and a battery capacity of 11.304 kWh with 1-day autonomy. For the town of Ngaoundere, it is composed by 10 PV modules and battery capacity of 11.304 kWh with 1-day autonomy. The related investment costs corresponding to these optimal configurations are USD 6225.6 for Maroua and Garoua and USD 7136.6 for Ngaoundere. The great proportion of the monthly energy demand consumed by the load is provided by the PV/Battery system. The monthly PV/Battery energy represents 60.385% to 72.546% of the load consumed in Maroua, 58.371% to 71.855% of the load consumed in Garoua, and 61.233% to 74.160% of the load consumed in Ngaoundere. The annual main grid energy consumed for one household is 1299.524 kWh in Maroua, 1352.818 kWh in Garoua, and 1260.876 kWh in Ngaoundere. Moreover, the annual PV/Battery energy consumed for one household is 1580.730 kWh in Maroua, 1527.815 kWh in Garoua, and 1619.530 kWh in Ngaoundere. Thus, the PV/Battery system, by reducing the grid energy consumption, acts as the principal source of energy of the whole system. The time the PV/Battery/Grid-connected system needs to be economically more advantageous than the electric grid without blackouts is 17 years for Maroua and 18 years for both Garoua and Ngaoundere. It is demonstrated in this paper that the hybrid PV/Battery/Grid-connected system is an effective solution for electrical load shedding in sub-Saharan zones. This system is very useful for grid energy consumption reduction. For a long-term investment, the PV/Battery/Grid-connected system is more economically advantageous than the main grid alone.
引用
收藏
页数:23
相关论文
共 36 条
[1]   Multi-objective genetic algorithm based sizing optimization of a stand-alone wind/PV power supply system with enhanced battery/supercapacitor hybrid energy storage [J].
Abdelkader, Abbassi ;
Rabeh, Abbassi ;
Ali, Dami Mohamed ;
Mohamed, Jemli .
ENERGY, 2018, 163 :351-363
[2]   The Impacts of PV-Wind-Diesel-Electric Storage Hybrid System on the Reliability of a Power System [J].
Adefarati, T. ;
Bansal, R. C. .
8TH INTERNATIONAL CONFERENCE ON APPLIED ENERGY (ICAE2016), 2017, 105 :616-621
[3]   Optimal operation of hybrid PV-battery system considering grid scheduled blackouts and battery lifetime [J].
Alramlawi, Mansour ;
Gabash, Aouss ;
Mohagheghi, Erfan ;
Li, Pu .
SOLAR ENERGY, 2018, 161 :125-137
[4]   Development of sustainable energy indexes by the utilization of new indicators: A comparative study [J].
Armin Razmjoo, A. ;
Sumper, Andreas ;
Davarpanah, Afshin .
ENERGY REPORTS, 2019, 5 :375-383
[5]   Feasibility analysis of grid-connected and islanded operation of a solar PV microgrid system: A case study of Iraq [J].
Aziz, Ali Saleh ;
Tajuddin, Mohammad Faridun Naim ;
Adzman, Mohd Rafi ;
Mohammed, Mohd Fayzul ;
Ramli, Makbul A. M. .
ENERGY, 2020, 191
[6]   Optimal sizing of photovoltaic pumping system with water tank storage using LPSP concept [J].
Bakelli, Yahia ;
Arab, Amar Hadj ;
Azoui, Boubekeur .
SOLAR ENERGY, 2011, 85 (02) :288-294
[7]   Techno-economic study of the impact of blackouts on the viability of connecting an off-grid PV-diesel hybrid system in Tanzania to the national power grid [J].
Bastholm, Caroline ;
Fiedler, Frank .
ENERGY CONVERSION AND MANAGEMENT, 2018, 171 :647-658
[8]   Smart multi-level energy management algorithm for grid-connected hybrid renewable energy systems in a micro-grid context [J].
Chakir, Asmae ;
Tabaa, Mohamed ;
Moutaouakkil, Fouad ;
Medromi, Hicham ;
Alami, Karim .
JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2020, 12 (05)
[9]   Review of solar photovoltaic water pumping system technology for irrigation and community drinking water supplies [J].
Chandel, S. S. ;
Naik, M. Nagaraju ;
Chandel, Rahul .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 49 :1084-1099
[10]  
Crampes C, 2012, INT CONF EUR ENERG