Expertise-based bid evaluation for construction-contractor selection with generalized comparative linguistic ELECTRE III

被引:135
作者
Chen, Zhen-Song [1 ]
Zhang, Xuan [1 ]
Rodriguez, Rosa M. [2 ]
Pedrycz, Witold [3 ]
Martinez, Luis [2 ]
机构
[1] Wuhan Univ, Sch Civil Engn, Wuhan 430072, Peoples R China
[2] Univ Jaen, Dept Comp Sci, Jaen 23071, Spain
[3] Univ Alberta, Dept Elect & Comp Engn, Edmonton, AB, Canada
基金
中国国家自然科学基金;
关键词
Bid evaluation; Multiple-criteria decision support; Construction management; ELECTRE III; Generalized comparative linguistic expressions; GROUP DECISION-MAKING; CONSENSUS REACHING PROCESS; TERM SETS; CRITERIA; PROJECTS; SYSTEM; MODEL; SUPPORT; INFORMATION; INTEGRATION;
D O I
10.1016/j.autcon.2021.103578
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The process of bid evaluation is subject to indetermination, imprecision, and uncertainty in terms of their alternative-criterion decision appraisals. To address this issue, this paper develops a novel ELECTRE III-based MCGDM approach for bid evaluation, in which generalized comparative linguistic expressions (GCLEs) are used to evaluate bidder performance. The collected GCLEs are further transformed into possibility-distributionbased hesitant fuzzy linguistic-term sets (HFLTSs) to facilitate the qualitative construction of individual expertise. A consensus-reaching process is introduced to promote decisions that are agreed upon by experts and thereby ensure an enhanced state of mutual agreement among the experts. Subsequently, an integrated subjective-objective approach is proposed to calculate criterion weights and to implement an ELECTRE III-based method that incorporates HFLTS possibility distributions, which allows us to treat the indetermination, imprecision, and uncertainty embedded in appraisals of alternative-criterion decisions when evaluating bids. The potential advantages of the proposed approach are validated by a real-life contractor-selection case.
引用
收藏
页数:18
相关论文
共 78 条
[51]   Contractor selection in government procurement auctions: a case study [J].
Padhi, Sidhartha Siladitya ;
Mohapatra, Pratap Kumar Jagadev .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2009, 3 (02) :170-186
[52]   Consensus under a fuzzy context: Taxonomy, analysis framework AFRYCA and experimental case of study [J].
Palomares, Ivan ;
Estrella, Francisco J. ;
Martinez, Luis ;
Herrera, Francisco .
INFORMATION FUSION, 2014, 20 :252-271
[53]   SUBCONTRACTOR SELECTION USING THE INTEGRATION OF THE AHP AND PROMETHEE METHODS [J].
Polat, Gul .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016, 22 (08) :1042-1054
[54]   Some interesting properties of the fuzzy linguistic model based on discrete fuzzy numbers to manage hesitant fuzzy linguistic information [J].
Riera, Juan Vicente ;
Massanet, Sebastia ;
Herrera-Viedma, Enrique ;
Torrens, Joan .
APPLIED SOFT COMPUTING, 2015, 36 :383-391
[55]   An Overview on Fuzzy Modelling of Complex Linguistic Preferences in Decision Making [J].
Rodriguez, Rosa M. ;
Labella, Alvaro ;
Martinez, Luis .
INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2016, 9 :81-94
[56]   A group decision making model dealing with comparative linguistic expressions based on hesitant fuzzy linguistic term sets [J].
Rodriguez, Rosa M. ;
Martinez, Luis ;
Herrera, Francisco .
INFORMATION SCIENCES, 2013, 241 :28-42
[57]   Hesitant Fuzzy Linguistic Term Sets for Decision Making [J].
Rodriguez, Rosa M. ;
Martinez, Luis ;
Herrera, Francisco .
IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2012, 20 (01) :109-119
[58]   A new system for weighting environmental criteria for use within ELECTRE III [J].
Rogers, M ;
Bruen, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (03) :552-563
[59]   Using ELECTRE III to choose route for Dublin Port motorway [J].
Rogers, M ;
Bruen, M .
JOURNAL OF TRANSPORTATION ENGINEERING, 2000, 126 (04) :313-323
[60]   ORME: A multicriteria rating methodology for buildings [J].
Roulet, CA ;
Flourentzou, F ;
Labben, HH ;
Santamouris, M ;
Koronaki, I ;
Dascalaki, E ;
Richalet, V .
BUILDING AND ENVIRONMENT, 2002, 37 (06) :579-586