An Operational Scheduling Model to Product Distribution through a Pipeline Network

被引:59
作者
Boschetto, Suelen N. [1 ]
Magatao, Leandro [1 ]
Brondani, William M. [1 ]
Neves, Flavio, Jr. [1 ]
Arruda, Lucia V. R. [1 ]
Barbosa-Povoa, Ana P. F. D. [2 ]
Relvas, Susana [2 ]
机构
[1] Univ Tecnol Fed Parana, Programa Posgrad Engn Eletr & Informat Ind, BR-80230901 Curitiba, Parana, Brazil
[2] Univ Tecn Lisboa, Inst Super Tecn, CEG IST, Ctr Estudos Gestao, P-1049001 Lisbon, Portugal
关键词
INTEGER PROGRAMMING APPROACH; MULTIPRODUCT PIPELINE; MILP; COMMODITIES; SYSTEMS;
D O I
10.1021/ie900685v
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Pipelines have been proved to be an efficient and economic way to transport oil products. However, the determination of the scheduling of operational activities in pipeline networks is a difficult task, and efficient methods to solve such complex problem are required. In this contribution, a real-world pipeline network is studied, and an optimization model is proposed in order to address the network scheduling activities. A hierarchical approach is proposed on the basis of the integration of a mixed integer linear programming (MILP) model and a set of heuristic modules. This article exploits the MILP model, the main goal of which is to determine the exact time instants that products should be pumped into the pipelines and received in the operational areas. These time instants must satisfy the pipeline network management and operational constraints for a predefined planning period. Such operational constraints include pipeline stoppages, movement of batches through many areas/pipelines, use of preferential routes to avoid contamination losses, on-peak demand hours of pumping, local constraints, reversions of flow direction, and surge tank operations, while satisfying a series of production/consumption requirements. The developed continuous-time model is applied to a large real-world pipeline system, where more than 14 oil derivatives and ethanol are transported and distributed between supply and demand nodes.
引用
收藏
页码:5661 / 5682
页数:22
相关论文
共 16 条
[1]   Optimal scheduling of multiproduct pipeline systems using a non-discrete MILP formulation [J].
Cafaro, DC ;
Cerdá, J .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (10) :2053-2068
[2]   Dynamic scheduling of multiproduct pipelines with multiple delivery due dates [J].
Cafaro, Diego C. ;
Cerda, Jaime .
COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (4-5) :728-753
[3]  
*ILOG SA, 2007, ILOG OPL DEV STUD 5
[4]  
Magatao L, 2005, COMP AID CH, V20a-20b, P1027
[5]   A mixed integer programming approach for scheduling commodities in a pipeline [J].
Magatao, L ;
Arruda, LVR ;
Neves, F .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (1-2) :171-185
[6]   Mixed-integer programming approach for short-term crude oil scheduling [J].
Moro, LFL ;
Pinto, JM .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2004, 43 (01) :85-94
[7]  
MOURA AV, 2008, 11 IEEE INT C COMP S, V44, P5
[8]  
Neves F, 2007, COMPUT-AIDED CHEM EN, V24, P697
[9]   Efficient MILP formulations and valid cuts for multiproduct pipeline scheduling [J].
Rejowski, R ;
Pinto, JM .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (08) :1511-1528
[10]   Scheduling of a multiproduct pipeline system [J].
Rejowski, R ;
Pinto, JM .
COMPUTERS & CHEMICAL ENGINEERING, 2003, 27 (8-9) :1229-1246