Benefits of backup sourcing for components in assembly systems under supply uncertainty

被引:13
作者
Pan, Wenting [1 ]
So, Kut C. [2 ]
Xiao, Guang [3 ]
机构
[1] USA Power Plant, Sch Econ & Business Adm, St Mary Coll Calif, Rm 117,1928 St Marys Rd, Moroga, CA 94575 USA
[2] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong 11 Yuk Choi Rd, Hong Kong 999077, Peoples R China
[3] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Hung Hom, M634,6-F Li Ka Shing Tower, Hong Kong 999077, Peoples R China
关键词
Supply chain management; Assembly systems; Procurement strategies; Backup sourcing; Supply uncertainty; RANDOM YIELD; PROCUREMENT STRATEGIES; ORDER; INVENTORY; DEMAND; COORDINATION; PERFORMANCE; POLICIES; CHAIN; DIVERSIFICATION;
D O I
10.1016/j.ejor.2021.12.014
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider an assembly system for a final product consisting of multiple components. The assembler orders each component from its primary supplier, and one of the components is subject to supply uncertainty in which the actual available quantity for assembly is only equal to a random fraction of the order quantity. After this actual available quantity is realized but before assembly for meeting final demand, the assembler can procure additional components from some backup suppliers. We derive the optimal ordering policy under this backup sourcing strategy and analyze the benefits of using backup suppliers in mitigating the adverse effect of supply uncertainty in component procurement from the primary suppliers. Our result shows that the availability of backup supplier for the component with supply uncertainty can provide very substantial benefits to the assembler, especially when the unit cost of this component from the primary supplier is high relative to the extra unit component cost from the backup supplier for high-margin products under an operating environment of high supply uncertainty and low demand uncertainty. We further show that the availability of backup suppliers for the other components with no supply uncertainty can provide additional significant benefits to the assembler when extra unit component cost of backup supplier for the unreliable component supplier is high for low-margin products with high demand uncertainty.(c) 2021 Elsevier B.V. All rights reserved.
引用
收藏
页码:158 / 171
页数:14
相关论文
共 57 条
[1]   Global Dual Sourcing: Tailored Base-Surge Allocation to Near- and Offshore Production [J].
Allon, Gad ;
Van Mieghem, Jan A. .
MANAGEMENT SCIENCE, 2010, 56 (01) :110-124
[2]   Contract design in agriculture supply chains with random yield [J].
Anderson, Edward ;
Monjardino, Marta .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 277 (03) :1072-1082
[3]   DIVERSIFICATION UNDER SUPPLY UNCERTAINTY [J].
ANUPINDI, R ;
AKELLA, R .
MANAGEMENT SCIENCE, 1993, 39 (08) :944-963
[4]   Managing inventory and supply performance in assembly systems with random supply capacity and demand [J].
Bollapragada, R ;
Rao, US ;
Zhang, J .
MANAGEMENT SCIENCE, 2004, 50 (12) :1729-1743
[5]   Optimal replenishment and rework with multiple unreliable supply sources [J].
Chen, JF ;
Yao, DD ;
Zheng, SH .
OPERATIONS RESEARCH, 2001, 49 (03) :430-443
[6]   Random yield and coordination mechanisms of a supply chain with emergency backup sourcing [J].
Chen, Kebing ;
Yang, Lei .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (16) :4747-4767
[7]   Supply Chain Coordination and Influenza Vaccination [J].
Chick, Stephen E. ;
Mamani, Hamed ;
Simchi-Levi, David .
OPERATIONS RESEARCH, 2008, 56 (06) :1493-1506
[8]   A PERIODIC REVIEW, PRODUCTION PLANNING-MODEL WITH UNCERTAIN CAPACITY AND UNCERTAIN DEMAND - OPTIMALITY OF EXTENDED MYOPIC POLICIES [J].
CIARALLO, FW ;
AKELLA, R ;
MORTON, TE .
MANAGEMENT SCIENCE, 1994, 40 (03) :320-332
[9]  
Cohen S., 2008, GLOBAL SUPPLY CHAIN
[10]   A newsvendor's procurement problem when suppliers are unreliable [J].
Dada, Maqbool ;
Petruzzi, Nicholas C. ;
Schwarz, Leroy B. .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2007, 9 (01) :9-32