The impact of design uncertainty in engineer-to-order project planning

被引:31
作者
Vaagen, Hajnalka [1 ,2 ]
Kaut, Michal [2 ]
Wallace, Stein W. [3 ]
机构
[1] Norwegian Univ Sci & Technol NTNU, Alesund, Norway
[2] SINTEF Technol & Soc, Trondheim, Norway
[3] Norwegian Sch Econ NHH, Bergen, Norway
关键词
Project scheduling; Engineer-to-order; Design uncertainty; Design flexibility;
D O I
10.1016/j.ejor.2017.03.005
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A major driver of planning complexity in engineer-to-order (ETO) projects is design uncertainty far into the engineering and production processes. This leads to uncertainty in technical information and will typically lead to a revision of parts of the project network itself. Hence, this uncertainty is different from standard task completion uncertainty. We build a stochastic program to draw attention to, and analyse, the engineering-design planning problem, and in particular, to understand what role design flexibility plays in hedging against such uncertainty. The purpose is not to devise a general stochastic dynamic model to be used in practice, but to demonstrate by the use of small model instances how design flexibility actually adds value to a project and what, exactly, it is that produces this value. This will help us understand better where and when to develop flexibility and buffers, even when not actually solving stochastic models. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:1098 / 1109
页数:12
相关论文
共 28 条
  • [1] [Anonymous], P CONLIFE AC C 2012
  • [2] Maximization of solution flexibility for robust shop scheduling
    Artigues, C
    Billaut, JC
    Esswein, C
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) : 314 - 328
  • [3] Proactive policies for the stochastic resource-constrained project scheduling problem
    Deblaere, Filip
    Demeulemeester, Erik
    Herroelen, Willy
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 214 (02) : 308 - 316
  • [4] Eckert C. M., 2003, P 14 INT C ENG DES, P91
  • [5] Lean Project Planning in Shipbuilding
    Emblemsvag, Jan
    [J]. JOURNAL OF SHIP PRODUCTION AND DESIGN, 2014, 30 (02): : 79 - 88
  • [6] Project scheduling under uncertainty: Survey and research potentials
    Herroelen, W
    Leus, R
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) : 289 - 306
  • [7] A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al.
    Herroelen, W
    Demeulemeester, E
    De Reyck, B
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 128 (03) : 679 - 688
  • [8] Herroelen W., 2002, PROJ MANAG J, V33, P48
  • [9] Herroelen W., 2007, TUTORIALS OPERATIONS, P124
  • [10] Improving project cost estimation by taking into account managerial flexibility
    Jorgensen, T
    Wallace, SW
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 127 (02) : 239 - 251