Exploring the Potential for Predicting Project Dispute Resolution Satisfaction Using Logistic Regression

被引:18
作者
Cheung, Sai On [1 ]
Yiu, Tak Wing [1 ]
Chan, Ho Wai [1 ]
机构
[1] City Univ Hong Kong, Dept Bldg & Construct, Hong Kong, Hong Kong, Peoples R China
关键词
Construction dispute resolution; Dispute resolution satisfaction; Logistic regression; Multivariate discriminant analysis; DISCRIMINANT-ANALYSIS; CLASSIFICATION; CONTRACTOR; SUPPORT; ERRORS; MODEL;
D O I
10.1061/(ASCE)CO.1943-7862.0000157
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The success of a construction project depends on the coordinated efforts of project team members. This is especially crucial when a project is in dispute and hence the achievement of satisfactory project dispute resolution is critical to project success. This proposition has been empirically demonstrated a previous research that studied project dispute resolution satisfaction (DRS) using multivariate discriminant analysis (MDA). This paper reports on a study that builds on that research, with the specific aim of predicting project DRS through the use of logistic regression (LR). In this study, a LR model of project DRS (Model 1) is developed, and then compared with the MDA model. The findings suggest that the LR technique provides a higher hit rate and thus a higher proportion of correct classification. With the wider acceptance of the use of alternative dispute resolution (ADR) methods, the effect, on the LR model, of changing the demarcation between adverse and favorable project DRS is also examined. For this examination, another LR model (Model 2) was developed. It is believed that Model 2 may reflect the prevailing sentiment that ADR is viewed as an amicable way to resolve disputes. Both the MDA model and LR models (Model 1 and Model 2) indicated that "design changes" are the root cause of adverse project DRS. Within the scope of the project data, these findings suggest that design changes are not just disruptive to project progress but also a critical cause of construction disputes.
引用
收藏
页码:508 / 517
页数:10
相关论文
共 72 条
[51]   CHOOSING BETWEEN LOGISTIC REGRESSION AND DISCRIMINANT-ANALYSIS [J].
PRESS, SJ ;
WILSON, S .
JOURNAL OF THE AMERICAN STATISTICAL ASSOCIATION, 1978, 73 (364) :699-705
[52]   QUANTITATIVE STUDY OF CONTRACTOR EVALUATION PROGRAMS AND THEIR IMPACT [J].
RUSSELL, JS ;
JASELSKIS, EJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (03) :612-624
[53]   Prediction of software failures through logistic regression [J].
Salem, AM ;
Rekab, K ;
Whittaker, JA .
INFORMATION AND SOFTWARE TECHNOLOGY, 2004, 46 (12) :781-789
[54]   CRITICAL SUCCESS FACTORS FOR CONSTRUCTION PROJECTS [J].
SANVIDO, V ;
GROBLER, F ;
PARFITT, K ;
GUVENIS, M ;
COYLE, M .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (01) :94-111
[55]   Job retention in child welfare: Effects of perceived organizational support, supervisor support, and intrinsic job value [J].
Smith, BD .
CHILDREN AND YOUTH SERVICES REVIEW, 2005, 27 (02) :153-169
[56]  
Spittler J.R., 1992, AACE T, V9, P1
[57]  
STOCKENBERG RA, 2001, BUILD DES CONSTRUCT, V42, P41
[58]  
Tillet G., 1991, RESOLVING CONFLICT P
[59]   USE OF ALTERNATIVE DISPUTE RESOLUTION IN THE CONSTRUCTION-INDUSTRY [J].
TREACY, TB .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (01) :58-63
[60]  
Tuman J., 1986, Proceedings of Project Management Institute, V1, P29