A revenue sharing contract for reverse supply chain coordination under stochastic quality of returned products and uncertain remanufacturing capacity

被引:85
作者
Heydari, Jafar [1 ]
Ghasemi, Maryam [1 ]
机构
[1] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
关键词
Reverse supply chain coordination; Revenue sharing; Remanufacturing capacity; Quality uncertainty; DESIGNING CONTRACTS; LOGISTICS; RECOVERY; OPTIMIZATION; DECISIONS; DEMAND;
D O I
10.1016/j.jclepro.2018.06.206
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper investigates a two-echelon reverse supply chain (RSC) consisting of a single remanufacturer and a single collector. The collector by offering a reward persuades consumers to take back their used products. Only items that meet the minimum quality level are accepted to be refurbished. There are two sources of uncertainties in the investigated RSC: (1) uncertainty in quality of returned products, (2) uncertainty in remanufacturing capacity. Under these circumstances, the amount of offered reward to consumers is a key problem. To optimize the whole RSC, the collector should determine the reward amount by considering the possibility of idle/overload capacity of the remanufacturing process. In the investigated RSC, the quality of returned products follows a uniform distribution and remanufacturing capacity follows a normal distribution. A customized revenue sharing mechanism is developed to share the risk of uncertainties between two members, fairly. The results indicate that, when remanufacturing capacity is limited, the suggested revenue sharing contract is able to share risks between participants and creates a win-win situation. In addition the suggested scheme is able to achieve channel coordination. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:607 / 615
页数:9
相关论文
共 45 条
[1]  
Ali Syed Mithun, 2016, International Journal of Advanced Operations Management, V8, P17
[2]   The effect of categorizing returned products in remanufacturing [J].
Aras, N ;
Boyaci, T ;
Verter, V .
IIE TRANSACTIONS, 2004, 36 (04) :319-331
[3]  
Bai H., 2008, REVERSE SUPPLY CHAIN
[4]  
Cachon GP, 2003, HDBK OPER R, V11, P229, DOI 10.1016/s0927-0507(03)11006-7
[5]  
Chaudhary Karishma, 2017, International Journal of Advanced Operations Management, V9, P143
[6]   Incentive strategies for an optimal recovery program in a closed-loop supply chain [J].
De Giovanni, Pietro ;
Reddy, Puduru V. ;
Zaccour, Georges .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 249 (02) :605-617
[7]   Design and planning of a closed-loop supply chain with three way recovery and buy-back offer [J].
Dutta, Pankaj ;
Das, Debabrata ;
Schultmann, Frank ;
Froehling, Magnus .
JOURNAL OF CLEANER PRODUCTION, 2016, 135 :604-619
[8]   A production/remanufacturing inventory model with price and quality dependant return rate [J].
El Saadany, Ahmed M. A. ;
Jaber, Mohamad Y. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (03) :352-362
[9]  
Ferguson M, 2009, PROD OPER MANAG, V18, P300, DOI [10.1111/j.1937-5956.2009.01033.x, 10.3401/poms.1080.01033]
[10]   Optimal production policy for a closed-loop hybrid system with uncertain demand and return under supply disruption [J].
Giri, B. C. ;
Sharma, S. .
JOURNAL OF CLEANER PRODUCTION, 2016, 112 :2015-2028