Project planning for construction under uncertainty with limited resources

被引:15
|
作者
Vaziri, Kabeh [1 ]
Carr, Paul G. [1 ]
Nozick, Linda K. [1 ]
机构
[1] Cornell Univ, Sch Civil & Environm Engn, Ithaca, NY 14853 USA
关键词
project management; uncertainty principles; resource management; construction industry;
D O I
10.1061/(ASCE)0733-9364(2007)133:4(268)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Much of the project scheduling literature treats task durations as deterministic. In reality, however, task durations are subject to considerable uncertainty, and that uncertainty can be influenced by the resources assigned. The purpose of this paper is to provide the means for contractors to optimally allocate their skilled workers among individual tasks for a single project. Instead of the traditional use of schedules, we develop control policies in the form of planned resource allocation to tasks that capture the uncertainty associated with task durations and the impact of resource allocation on those durations. We develop a solution procedure for the model and illustrate the ideas in an example. The data for the example is collected from a real project.
引用
收藏
页码:268 / 276
页数:9
相关论文
共 50 条
  • [1] Toward Reducing Construction Project Delivery Time under Limited Resources
    Mohamed, Hossam H.
    Ibrahim, Ahmed H.
    Soliman, Asmaa A.
    SUSTAINABILITY, 2021, 13 (19)
  • [2] Project planning under temporal uncertainty
    Biundo, S
    Holzer, R
    Schattenberg, B
    Planning, Scheduling and Constraint Satisfaction: From Theory to Practice, 2005, 117 : 189 - 198
  • [3] Planning with Concurrency under Resources and Time Uncertainty
    Beaudry, Eric
    Kabanza, Froduald
    Michaud, Francois
    ECAI 2010 - 19TH EUROPEAN CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2010, 215 : 217 - 222
  • [4] MINIMIZATION OF TIME OF PROJECT DURATION UNDER LIMITED RESOURCES
    ZALOUDEK, J
    EKONOMICKO-MATEMATICKY OBZOR, 1975, 11 (02): : 177 - 188
  • [5] Risk, Robustness and Water Resources Planning Under Uncertainty
    Borgomeo, Edoardo
    Mortazavi-Naeini, Mohammad
    Hall, Jim W.
    Guillod, Benoit P.
    EARTHS FUTURE, 2018, 6 (03): : 468 - 487
  • [6] Nontrivial effects of uncertainty on epidemic spreading under limited resources
    Jiang, Jian
    Zhou, Tianshou
    PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2019, 532
  • [7] Tactical project planning under uncertainty: fuzzy approach
    Masmoudi, Malek
    Hans, Erwin W.
    Hait, Alain
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 10 (03) : 301 - 322
  • [8] A new formulation for the project scheduling problem under limited resources
    Bianco, Lucio
    Caramia, Massimiliano
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 6 - 24
  • [9] A new formulation for the project scheduling problem under limited resources
    Lucio Bianco
    Massimiliano Caramia
    Flexible Services and Manufacturing Journal, 2013, 25 : 6 - 24
  • [10] Framework for an interactive project scheduling system under limited resources
    Bogazici Univ, Bebek Istanbul, Turkey
    Eur J Oper Res, 2 (362-375):