Reliability qualification testing for permanently installed wellbore equipment

被引:0
作者
不详
机构
来源
JOURNAL OF PETROLEUM TECHNOLOGY | 2000年 / 52卷 / 10期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Reservoir monitoring and intelligent completions require permanent downhole equipment to monitor and control wells with flow-control devices. Reliability qualification testing (RQT) is essential for these systems that are installed in a severe downhole environment. Reliability testing identifies weak links, measures progress, and builds confidence to avoid risks and surprises. Ten years of experience with downhole safety valves and permanent gauge installations show surprisingly similar reliability and testing problems to those experienced in automotive and aerospace applications. RQT provides an objective set of techniques to develop and deploy reliable long-life systems.
引用
收藏
页码:60 / 61
页数:2
相关论文
共 50 条
[31]   PERMANENTLY INSTALLED TRANSDUCERS FOR GUIDED WAVE MONITORING OF PIPELINES [J].
Evans, Mark ;
Vine, Keith .
10TH EUROPEAN CONFERENCE ON NON-DESTRUCTIVE TESTING 2010 (ECNDT), VOLS 1-5, 2010, :649-654
[32]   GUIDED WAVE PERMANENTLY INSTALLED PIPELINE MONITORING SYSTEM [J].
Galvagni, A. ;
Cawley, P. .
REVIEW OF PROGRESS IN QUANTITATIVE NONDESTRUCTIVE EVALUATION, VOLS 31A AND 31B, 2012, 1430 :1591-1598
[33]   A Permanently Installed Guided Wave System for Pipe Monitoring [J].
Galvagni, Andrea ;
Cawley, Peter .
HEALTH MONITORING OF STRUCTURAL AND BIOLOGICAL SYSTEMS 2012, 2012, 8348
[34]   RELIABILITY OF STANDBY EQUIPMENT WITH PERIODIC TESTING. [J].
Sim, S.H. .
IEEE Transactions on Reliability, 1987, R-36 (01) :117-123
[35]   TESTING IMPROVES SURFACE BOP EQUIPMENT RELIABILITY [J].
MONTGOMERY, ME .
OIL & GAS JOURNAL, 1993, 91 (24) :44-44
[36]   Review of Testing and Qualification of Post-Installed Anchors under Seismic Actions for Structural Applications [J].
Stehle, Erik Johannes ;
Sharma, Akanshu .
CIVILENG, 2021, 2 (02) :406-420
[37]   Safety equipment qualification [J].
Goble, William .
HYDROCARBON PROCESSING, 2011, 90 (12) :90-90
[38]   Equipment Qualification in Practice [J].
LG GC, 2 (148)
[39]   Principles of Equipment Qualification [J].
Schmitt, Siegfried .
BIOPHARM INTERNATIONAL, 2022, 35 (11) :42-42
[40]   Equipment qualification in practice [J].
Huber, L .
LC GC-MAGAZINE OF SEPARATION SCIENCE, 1998, 16 (02) :148-+