Reliability qualification testing for permanently installed wellbore equipment

被引:0
|
作者
不详
机构
来源
JOURNAL OF PETROLEUM TECHNOLOGY | 2000年 / 52卷 / 10期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Reservoir monitoring and intelligent completions require permanent downhole equipment to monitor and control wells with flow-control devices. Reliability qualification testing (RQT) is essential for these systems that are installed in a severe downhole environment. Reliability testing identifies weak links, measures progress, and builds confidence to avoid risks and surprises. Ten years of experience with downhole safety valves and permanent gauge installations show surprisingly similar reliability and testing problems to those experienced in automotive and aerospace applications. RQT provides an objective set of techniques to develop and deploy reliable long-life systems.
引用
收藏
页码:60 / 61
页数:2
相关论文
共 50 条
  • [1] SEISMIC QUALIFICATION BY TESTING FOR ELECTRICAL AND ACTIVE MECHANICAL EQUIPMENT TO BE INSTALLED IN HARD-ROCK HIGH FREQUENCY SITES
    Chen, Pei-Ying
    Ng, Ching Hang
    ASME PRESSURE VESSELS AND PIPING CONFERENCE, VOL 8: SEISMIC ENGINEERING, 2010, : 11 - 15
  • [2] SEISMIC QUALIFICATION OF EQUIPMENT BY GENERIC TESTING
    SHIPWAY, GD
    JOURNAL OF THE ACOUSTICAL SOCIETY OF AMERICA, 1977, 62 : S73 - S73
  • [3] CBTC EQUIPMENT EMC QUALIFICATION TESTING
    Glennie, Neil
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2014, 2014,
  • [4] A review of the equipment qualification testing sequence
    Goo, CS
    Kim, BR
    1999 IEEE NUCLEAR SCIENCE SYMPOSIUM - CONFERENCE RECORD, VOLS 1-3, 1999, : 1686 - 1690
  • [5] Accelerated reliability qualification in automotive testing
    Porter, A
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2004, 20 (02) : 115 - 120
  • [6] PERMANENTLY INSTALLED DIGESTIVE CANNULAE
    WILLES, RF
    JOURNAL OF DAIRY SCIENCE, 1972, 55 (08) : 1188 - &
  • [7] THE PROCESS OF EQUIPMENT QUALIFICATION TESTING AND PROBLEMS OF IMPLEMENTATION
    CARFAGNO, SP
    PAULSON, DV
    YOUNG, PT
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1984, 103 (07): : 1649 - 1653
  • [9] Efficient Method for Accelerated Reliability Qualification Testing
    任志乾
    于宗乐
    陶俊勇
    林武强
    Journal of Donghua University(English Edition), 2014, 31 (06) : 882 - 885
  • [10] Efficient method for accelerated reliability qualification testing
    Ren, Zhi-Qian
    Yu, Zong-Yue
    Tao, Jun-Yong
    Lin, Wu-Qiang
    Journal of Donghua University (English Edition), 2014, 31 (06) : 882 - 885