Application of lean in construction using value stream mapping

被引:30
作者
Ramani, Prasanna Venkatesan [1 ]
Lingan, Laxmana Kumara K. S. D. [2 ]
机构
[1] Vellore Inst Technol, Sch Civil Engn, Vellore, Tamil Nadu, India
[2] Larsen & Toubro Ltd, Mumbai, Maharashtra, India
关键词
Management; Construction; Productivity; Project management; Construction site;
D O I
10.1108/ECAM-12-2018-0572
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Lean construction is a technique that aims at reducing waste in construction and maximizing productivity. The purpose of this paper is to discuss the effectiveness of Lean technique in managing construction projects. Design/methodology/approach A case study of structural steel erection project was chosen where the value stream mapping lean tool is applied and the possible improvement in productivity was observed. The current state of the activities in the erection process was mapped first which was followed by preparing the Future State Map of the activities after eliminating the non-value adding tasks. Findings The modifications from Future State Map were carried out at the project and the results exhibited a substantial increase in productivity by reducing the project duration by 13 days which is about 30 per cent savings from the expected completion time after the implementation of Lean technique. Originality/value Traditionally lean concept has been widely used in process-oriented manufacturing industry whereas it is relatively new to the project-oriented construction industry. This current research has focused on applying lean tool to a real time construction project at the site level and measuring its outcome practically. The results of this study are real and affirm the effectiveness of applying lean concept to construction projects. It will be major paradigm shift in terms of managing construction projects.
引用
收藏
页码:216 / 228
页数:13
相关论文
共 19 条
[1]  
AlSehaimi A., 2008, P 8 INT POSTGR C BUI
[2]  
AlSehaimi A., 2008, 16 ANN CNFERENCE INT, P95
[3]  
[Anonymous], 2005, 13 ANN C INT GROUP L
[4]   Applying lean thinking in construction and performance improvement [J].
Aziz, Remon Fayek ;
Hafez, Sherif Mohamed .
ALEXANDRIA ENGINEERING JOURNAL, 2013, 52 (04) :679-695
[5]  
Chen J.C., 2012, American Journal of Industrial and Business Management, V2, P17, DOI [DOI 10.4236/AJIBM.2012.22004, https://doi.org/10.4236/ajibm.2012.22004]
[6]   Performance analysis of new product development projects An approach based on value stream mapping [J].
Ciarapica, Filippo Emanuele ;
Bevilacqua, Maurizio ;
Mazzuto, Giovanni .
INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2016, 65 (02) :177-206
[7]  
Damelio R., 1996, BASICS PROCESS MAPPI
[8]  
Faniran O.O., 1998, J ENG CONSTRUCTION A, V5, P182, DOI DOI 10.1108/EB021073
[9]   Material waste in building industry: Main causes and prevention [J].
Formoso, CT ;
Soibelman, L ;
De Cesare, C ;
Isatto, EL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (04) :316-325
[10]  
Green S.D., 1999, CONSTR MANAG ECON, V17, P133