Resulted are the basic data of the long-term researches executed at the Ufa state Oil university and directed on increase of rocks destruction efficiency by rock destruction tools, upgrading of tools. Given are the specified formulas for calculation of limiting drilling mud pressure in the well from a condition of keeping of walls in an elastic state.