A FRAMEWORK FOR RESCHEDULING A FIXED-LAYOUT ASSEMBLY SYSTEM USING DISCRETE-EVENT SIMULATION

被引:1
作者
Billiet, Harold [1 ]
Stark, Rainer [1 ]
机构
[1] Tech Univ Berlin, Chair Ind Informat Technol, Pascalstr 8-9, D-10587 Berlin, Germany
来源
2022 WINTER SIMULATION CONFERENCE (WSC) | 2022年
关键词
MANUFACTURING SYSTEM; DESIGN;
D O I
10.1109/WSC57314.2022.10015383
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This paper presents a framework for the rescheduling of Fixed-Layout Assembly (FLA) systems. It relies on the automatic generation of a Discrete-Event Simulation (DES) model. FLA systems are used for the assembly of large and bulky products in small volume. Because of their characteristics, they are subject to lots of disturbances and plan deviations throughout the execution stage. Planners currently use their experience to forecast the impact of these changes on the whole assembly system and to imagine new scheduling scenarios. Conventional DES methods are adapted to inflexible and automated manufacturing systems and are often not used for FLA systems. Planners would strongly benefit from a simple and effective solution to quickly forecast the impact of errors and new scheduling scenarios on the whole assembly system. The framework presented in this paper addresses this problem.
引用
收藏
页码:1762 / 1771
页数:10
相关论文
共 25 条
[1]   A simulation optimization approach for flow-shop scheduling problem: a canned fruit industry [J].
Azadeh, A. ;
Maleki-Shoja, B. ;
Sheikhalishahi, M. ;
Esmaili, A. ;
Ziaeifar, A. ;
Moradi, B. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (1-4) :751-761
[2]  
BANGSOW S., 2020, Tecnomatix Plant Simulation- Modeling and Programming by Means of Examples, V2nd
[3]   Identifying FMS repetitive patterns for efficient search-based scheduling algorithm: A colored Petri net approach [J].
Baruwa, Olatunde T. ;
Piera, Miquel A. .
JOURNAL OF MANUFACTURING SYSTEMS, 2015, 35 :120-135
[4]  
Bergmann S., 2014, ASIM 2014, P63
[5]  
Bergmann S, 2011, WINT SIMUL C PROC, P2223, DOI 10.1109/WSC.2011.6147934
[6]  
Bracht U., 2018, Digitale Fabrik
[7]  
Burggraf P., 2021, Fabrikplanung, V2
[8]   A roadmap for Assembly 4.0: self-configuration of fixed-position assembly islands under Graduation Intelligent Manufacturing System [J].
Guo, Daqiang ;
Zhong, Ray Y. ;
Ling, Shiquan ;
Rong, Yiming ;
Huang, George Q. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (15) :4631-4646
[9]   Digital twin-enabled Graduation Intelligent Manufacturing System for fixed-position assembly islands [J].
Guo, Daqiang ;
Zhong, Ray Y. ;
Lin, Peng ;
Lyu, Zhongyuan ;
Rong, Yiming ;
Huang, George Q. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2020, 63
[10]   Towards Assembly 4.0: Graduation Intelligent Manufacturing System for Fixed-position Assembly Islands [J].
Guo, Daqiang ;
Lin, Peng ;
Lyu, Zhongyuan ;
Ling, Shiquan ;
Li, Mingxing ;
Huang, George Q. ;
Hong, Yiming .
IFAC PAPERSONLINE, 2019, 52 (13) :1513-1518