Two-stage stochastic programming formulation for optimal design and operation of multi-microgrid system using data-based modeling of renewable energy sources
被引:67
作者:
Han, Dongho
论文数: 0引用数: 0
h-index: 0
机构:
Korea Adv Inst Sci & Technol, Dept Chem & Biomol Engn, 291 Daehak Ro, Daejeon 34141, South KoreaKorea Adv Inst Sci & Technol, Dept Chem & Biomol Engn, 291 Daehak Ro, Daejeon 34141, South Korea
Han, Dongho
[1
]
Lee, Jay H.
论文数: 0引用数: 0
h-index: 0
机构:
Korea Adv Inst Sci & Technol, Dept Chem & Biomol Engn, 291 Daehak Ro, Daejeon 34141, South KoreaKorea Adv Inst Sci & Technol, Dept Chem & Biomol Engn, 291 Daehak Ro, Daejeon 34141, South Korea
Lee, Jay H.
[1
]
机构:
[1] Korea Adv Inst Sci & Technol, Dept Chem & Biomol Engn, 291 Daehak Ro, Daejeon 34141, South Korea
Multi-microgrid;
Uncertainty modeling;
Two-stage stochastic programming;
Monte Carlo simulation;
Optimal topology;
Optimal operation;
DISTRIBUTION NETWORKS;
POWER EXCHANGE;
OPTIMIZATION;
COOPERATION;
ALGORITHM;
D O I:
10.1016/j.apenergy.2021.116830
中图分类号:
TE [石油、天然气工业];
TK [能源与动力工程];
学科分类号:
0807 ;
0820 ;
摘要:
Microgrid (MG) is intended to accommodate distributed renewable energy sources and manage the generated electricity using a dispatch and storage system to satisfy the demand of a local region over time. Main challenges associated with operating such a system stems primarily from the intermittent and uncertain nature of renewable energy sources causing the energy generation to be highly irregular and less predictable. Multi-microgrid (MMG) systems with flexibility to trade energy between individual MGs can alleviate the demand-supply mismatch problem, but its design and operation become more complicated. Previous studies on MMGs addressed only the case where all the MGs are fully connected to share electricity. However, the installation of electric cable connections over the full network can be costly and is often unjustified. To address the question of how to best achieve a tradeoff, this work proposes the use of a two-stage stochastic decision-making approach for designing and operating an MMG considering both the capital cost for installing the electric cables and operating cost. First, real weather data are used to develop stochastic models that describe the uncertain, intermittent nature of energy production through renewable sources over a day. Then, in the first stage, design-level decisions regarding the installation of the electric cable between individual pairs of the MGs are to be determined to achieve the best tradeoff for the modeled system and weather pattern. In the second stage, the optimal energy dispatch planning for each individual MG including the energy trading between the MGs is carried out based on a particular realized scenario of the renewable energy production.
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
Tang, Chong
;
Liu, Mingbo
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
Liu, Mingbo
;
Dai, Yue
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
Dai, Yue
;
Wang, Zhijun
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
Wang, Zhijun
;
Xie, Min
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
机构:
Chinese Univ Hong Kong, Hong Kong, Hong Kong, Peoples R China
Univ Washington, Clean Energy Inst, Seattle, WA 98195 USAChinese Univ Hong Kong, Hong Kong, Hong Kong, Peoples R China
Wang, Hao
;
Huang, Jianwei
论文数: 0引用数: 0
h-index: 0
机构:
Chinese Univ Hong Kong, Network Commun & Econ Lab, Dept Informat Engn, Hong Hom, Hong Kong, Peoples R ChinaChinese Univ Hong Kong, Hong Kong, Hong Kong, Peoples R China
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
Tang, Chong
;
Liu, Mingbo
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
Liu, Mingbo
;
Dai, Yue
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
Dai, Yue
;
Wang, Zhijun
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
Wang, Zhijun
;
Xie, Min
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Guangdong, Peoples R China
机构:
Chinese Univ Hong Kong, Hong Kong, Hong Kong, Peoples R China
Univ Washington, Clean Energy Inst, Seattle, WA 98195 USAChinese Univ Hong Kong, Hong Kong, Hong Kong, Peoples R China
Wang, Hao
;
Huang, Jianwei
论文数: 0引用数: 0
h-index: 0
机构:
Chinese Univ Hong Kong, Network Commun & Econ Lab, Dept Informat Engn, Hong Hom, Hong Kong, Peoples R ChinaChinese Univ Hong Kong, Hong Kong, Hong Kong, Peoples R China