On Use of Construction Technology Designs for Expert Opinions

被引:1
作者
Jarsky, Cenek [1 ]
Popenkova, Miloslava [1 ]
Gasparik, Jozef [2 ]
St'astny, Patrik [2 ]
机构
[1] Czech Tech Univ, Fac Civil Engn, Dept Construct Technol, Thakurova 7, Prague 16629, Czech Republic
[2] Slovak Univ Technol Bratislava, Fac Civil Engn, Dept Bldg Technol, Bratislava 81005, Slovakia
关键词
financial and time planning; construction technology design; expert opinions; management of projects; computer model; BIM; SUSTAINABILITY; OPTIMIZATION; MANAGEMENT; INFORMATION;
D O I
10.3390/su14095672
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This article describes the basic principles and results of an expert system for construction planning and management. In the field of expert opinions, the system greatly helps to determine the limit of unreasonably low construction prices on the basis of a rapid cost analysis. Additionally, it can determine the technologically shortest possible construction periods or can answer the question of whether it is possible to complete the construction in the specified period, provided that a certain amount of construction is currently underway, which is very useful in expert opinions. The system is based on modeling the construction process using the so-called construction technology network graphs. This method allows, among other things, to create and use so-called typical network graphs as preprepared models of individual types of objects in the form of computer files, which can be modified according to the spatial structure of real buildings or facilities when used in creating a feasibility study or efficient time and financial planning and management of the building process. The system also enables the automatic creation of quality assurance checklists (inspection and acceptance plans for quality assurance), environmental plans (plans for the elimination of adverse effects of construction activities on the environment), and safety and health plans. Direct links to the bills of quantities (list of works and supplies with numbering of individual items), budgets (list of works and supplies with prices), or production calculations, despite the operational records of the actual construction process also on the company's accounting agenda, are available.
引用
收藏
页数:12
相关论文
共 25 条
  • [1] Analysis of cost comparison and effects of change orders during construction: Study of a mass timber and a concrete building project
    Ahmed, Shafayet
    Arocho, Ingrid
    [J]. JOURNAL OF BUILDING ENGINEERING, 2021, 33
  • [2] An integrated decision support system for building asset management based on BIM and Work Breakdown Structure
    Al-Kasasbeh, Maha
    Abudayyeh, Osama
    Liu, Hexu
    [J]. JOURNAL OF BUILDING ENGINEERING, 2021, 34
  • [3] Automated Methods and Systems for Construction Planning and Scheduling: Critical Review of Three Decades of Research
    Amer, Fouad
    Koh, Hui Yi
    Golparvar-Fard, Mani
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (07)
  • [4] [Anonymous], 2015, Quality Management SystemsRequirements
  • [5] [Anonymous], 2018, 450012018 ISO
  • [6] [Anonymous], 2015, 14001 ISO
  • [7] Integrated implementation of Virtual Design and Construction (VDC) and lean project delivery system (LPDS)
    Aslam, Mughees
    Gao, Zhili
    Smith, Gary
    [J]. JOURNAL OF BUILDING ENGINEERING, 2021, 39
  • [8] A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling
    Dasovic, Borna
    Galic, Mario
    Klansek, Uros
    [J]. SUSTAINABILITY, 2020, 12 (08)
  • [9] Gasparik J., 2019, QUALITY ENV OCCUPATI, P131
  • [10] Multi-Criteria Optimization of Mechanized Earth Processes and Its Impact on Economic and Environmental Sustainability
    Gasparik, Jozef
    Motycka, Vit
    Stastny, Patrik
    Szalayova, Sylvia
    [J]. SUSTAINABILITY, 2022, 14 (01)