Hinterland freight transportation replanning model under the framework of synchromodality

被引:44
作者
Qu, Wenhua [1 ]
Rezaei, Jafar [1 ]
Maknoon, Yousef [1 ]
Tavasszy, Lorant [1 ]
机构
[1] Delft Univ Technol, Dept Technol Policy & Management, POB 5015, NL-2600 GA Delft, Netherlands
关键词
Freight transportation replanning; Uncertainty management; Synchromodality; Shipment split; Synchronization of shipment and services; SERVICE NETWORK DESIGN; CONTAINER; SOLVE;
D O I
10.1016/j.tre.2019.09.014
中图分类号
F [经济];
学科分类号
02 ;
摘要
Hinterland freight transportation is managed according to a pre-designed schedule. In daily operations, unexpected uncertainties cause deviation from the original plan. Thus replanning is needed to deal with the perturbations and complete the transportation tasks. This paper proposes a mixed-integer programming model to re-plan hinterland freight transportation, based on the framework of synchromodality. It is a holistic resolution of shipment flow rerouting, consequence transshipment organization in the intermediate terminals, and corresponding service rescheduling. The replanning benefits from a high operational flexibility and coordination via a split of shipment and aligning the departure time of service flows with the shipment flows.
引用
收藏
页码:308 / 328
页数:21
相关论文
共 30 条
  • [1] Designing new European rail freight services
    Andersen, J.
    Christiansen, M.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (03) : 348 - 360
  • [2] Two-stage robust network row and design under demand uncertahty
    Atamtuerk, Alper
    Zhang, Muhong
    [J]. OPERATIONS RESEARCH, 2007, 55 (04) : 662 - 673
  • [3] Stochastic service network design with rerouting
    Bai, Ruibin
    Wallace, Stein W.
    Li, Jingpeng
    Chong, Alain Yee-Loong
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2014, 60 : 50 - 65
  • [4] Behdani B, 2016, EUR J TRANSP INFRAST, V16, P424
  • [5] The multi-objective railway timetable rescheduling problem
    Binder, Stefan
    Maknoon, Yousef
    Bierlaire, Michel
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 78 : 78 - 94
  • [6] Modelling network travel time reliability under stochastic demand
    Clark, S
    Watling, D
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2005, 39 (02) : 119 - 140
  • [7] Integrating train scheduling and delay management in real-time railway traffic control
    Corman, Francesco
    D'Ariano, Andrea
    Marra, Alessio D.
    Pacciarelli, Dario
    Sama, Marcella
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 105 : 213 - 239
  • [8] Equilibrium models in multimodal container transport systems
    Corman, Francesco
    Viti, Francesco
    Negenborn, Rudy R.
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (01) : 125 - 153
  • [9] Optimal multi-class rescheduling of railway traffic
    Corman, Francesco
    D'Ariano, Andrea
    Hansen, Ingo A.
    Pacciarelli, Dario
    [J]. JOURNAL OF RAIL TRANSPORT PLANNING & MANAGEMENT, 2011, 1 (01) : 14 - 24
  • [10] Scenario grouping in a progressive hedging-based meta-heuristic for stochastic network design
    Crainic, Teodor Gabriel
    Hewitt, Mike
    Rei, Walter
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2014, 43 : 90 - 99