On the Gerber-Shiu discounted penalty function for a surplus process described by PDMPs

被引:0
作者
He, Jing Min [1 ]
Wu, Rong [2 ]
机构
[1] Tianjin Univ Technol, Coll Sci, Tianjin 300384, Peoples R China
[2] Nankai Univ, Sch Math Sci, Tianjin 300071, Peoples R China
关键词
Gerber-Shiu discounted penalty function; piecewise deterministic Markov process; ultimate ruin probability; Volterra integral equation; INTEREST FORCE; RUIN; DEFICIT; TIME;
D O I
10.1007/s10114-010-6573-5
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
In this paper, we investigate the Gerber-Shiu discounted penalty function for the surplus process described by a piecewise deterministic Markov process (PDMP).We derive an integral equation for the Gerber-Shiu discounted penalty function, and obtain the exact solution when the initial surplus is zero. Dickson formulae are also generalized to the present surplus process.
引用
收藏
页码:951 / 962
页数:12
相关论文
共 16 条
[1]   On the expected discounted penalty function at ruin of a surplus process with interest [J].
Cai, J ;
Dickson, DCM .
INSURANCE MATHEMATICS & ECONOMICS, 2002, 30 (03) :389-404
[2]  
DASSIOS A, 1989, COMM STATIST STOCHAS, V5, P181
[3]  
Davis M. H. A., 1993, MARKOV MODELS OPTIMI
[4]  
DAVIS MHA, 1984, J ROY STAT SOC B MET, V46, P353
[5]   ON THE DISTRIBUTION OF THE SURPLUS PRIOR TO RUIN [J].
DICKSON, DCM .
INSURANCE MATHEMATICS & ECONOMICS, 1992, 11 (03) :191-207
[6]   THE SURPLUSES IMMEDIATELY BEFORE AND AT RUIN, AND THE AMOUNT OF THE CLAIM CAUSING RUIN [J].
DUFRESNE, F ;
GERBER, HU .
INSURANCE MATHEMATICS & ECONOMICS, 1988, 7 (03) :193-199
[7]  
Gerber H., 1987, Astin Bulletin, V17, P151, DOI [10.2143/AST.17.2.2014970, DOI 10.2143/AST.17.2.2014970]
[8]   The joint distribution of the time of ruin, the surplus immediately before ruin, and the deficit at ruin [J].
Gerber, HU ;
Shiu, ESW .
INSURANCE MATHEMATICS & ECONOMICS, 1997, 21 (02) :129-137
[9]  
Gerber HU., 1998, North Amer-ican Actuarial Journal, V2, P48, DOI [10.1080/10920277.1998.10595671, DOI 10.1080/10920277.1998.10595671]
[10]   The moments of the time of ruin, the surplus before ruin, and the deficit at ruin [J].
Lin, XS ;
Willmot, GE .
INSURANCE MATHEMATICS & ECONOMICS, 2000, 27 (01) :19-44