Minimizing job tardiness using integrated preventive maintenance planning and production scheduling

被引:141
作者
Cassady, CR
Kutanoglu, E
机构
[1] Univ Arkansas, Dept Ind Engn, Fayetteville, AR 72701 USA
[2] Univ Texas, Dept Mech Engn, Operat Res & Ind Engn Program, Austin, TX 78712 USA
关键词
D O I
10.1080/07408170304416
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Production scheduling and preventive maintenance planning decisions are inter-dependent but most often made independently. Given that maintenance affects available production time and elapsed production time affects the probability of machine failure, this interdependency seems to be overlooked in the literature. We propose an integrated model that simultaneously determines production scheduling and preventive maintenance planning decisions so that the total weighted tardiness of jobs is minimized. We investigate the benefits of integration through a numerical study of small problems. We compare the integrated solution and its performance with the solutions obtained from solving the production scheduling and preventive maintenance planning problems independently. The numerical results show an average reduction of 30% in expected total weighted tardiness. Finally, we discuss the issues related to solving larger problems and extensions for future study.
引用
收藏
页码:503 / 513
页数:11
相关论文
共 28 条
[11]  
2-#
[12]   Impact of maintenance policies on the performance of manufacturing cells [J].
Kelly, CM ;
Mosier, CT ;
Mahmoodi, F .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (03) :767-787
[13]   Routing-based reactive scheduling policies for machine failures in dynamic job shops [J].
Kutanoglu, E ;
Sabuncuoglu, I .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (14) :3141-3158
[14]  
Lee CY, 2000, NAV RES LOG, V47, P145, DOI 10.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO
[15]  
2-3
[16]   HEURISTIC ALGORITHMS FOR SOLVING EARLINESS-TARDINESS SCHEDULING PROBLEM WITH MACHINE VACATIONS [J].
MANNUR, NR ;
ADDAGATLA, JB .
COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) :255-258
[17]   MAINTENANCE POLICIES FOR STOCHASTICALLY FAILING EQUIPMENT - A SURVEY [J].
MCCALL, JJ .
MANAGEMENT SCIENCE, 1965, 11 (05) :493-524
[18]   Maintenance scheduling and staffing policies in a wafer fabrication facility [J].
Mosley, SA ;
Teyner, T ;
Uzsoy, RM .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1998, 11 (02) :316-323
[19]   SURVEY OF MAINTENANCE MODELS - CONTROL AND SURVEILLANCE OF DETERIORATING SYSTEMS [J].
PIERSKALLA, WP ;
VOELKER, JA .
NAVAL RESEARCH LOGISTICS, 1976, 23 (03) :353-388
[20]  
Pinedo M., 1995, Scheduling: Theory, Algorithms, and Systems, V2nd