Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm

被引:29
作者
Kim, Jin-Lee [1 ]
Ellis, Ralph D., Jr. [2 ]
机构
[1] Calif State Univ Long Beach, Dept Engn & Construct Engn Management, Vivian Engn Ctr 306A, Long Beach, CA 90840 USA
[2] Univ Florida, Dept Civil & Coastal Engn, Gainesville, FL 32611 USA
关键词
Optimization; Project management; Scheduling; Resource; Genetic algorithms; Comparative study; OPTIMAL-MODEL; OPTIMIZATION; HEURISTICS; BRANCH;
D O I
10.1061/(ASCE)0733-9364(2010)136:2(160)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An issue has arisen with regard to which of the schedule generation schemes will perform better for an arbitrary instance of the resource-constrained project scheduling problem (RCPSP), which is one of the most challenging areas in construction engineering and management. No general answer has been given to this issue due to the different mechanisms between the serial scheme and the parallel scheme. In an effort to address this issue, this paper compares the two schemes using a permutation-based Elitist genetic algorithm for the RCPSP. Computational experiments are presented with multiple standard problems. From the results of a paired difference experiment, the algorithm using the serial scheme provides better solutions than the one using the parallel scheme. The results also show that the algorithm with the parallel scheme takes longer to solve each problem than the one using the serial scheme.
引用
收藏
页码:160 / 169
页数:10
相关论文
共 30 条
[21]   Search heuristics for resource constrained project scheduling [J].
Lee, JK ;
Kim, YD .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1996, 47 (05) :678-689
[22]   Fuzzy optimal model for resource-constrained construction scheduling [J].
Leu, SS ;
Chen, AT ;
Yang, CH .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1999, 13 (03) :207-216
[23]   GA-based multicriteria optimal model for construction scheduling [J].
Leu, SS ;
Yang, CH .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (06) :420-427
[24]  
Liu Y, 2005, Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, P3428
[25]  
Meyer R., 1998, A minitab guide to statistics
[26]  
Pinson E., 1994, Proceedings of the fourth international workshop on project management and scheduling, P102
[27]   Application of genetic algorithms to construction scheduling with or without resource constraints [J].
Toklu, YC .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2002, 29 (03) :421-429
[28]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS USING BRANCH AND BOUND METHODS [J].
WILLIS, RJ ;
HASTINGS, NAJ .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (02) :341-349
[29]   Permutation-based particle swarm optimization for resource-constrained project scheduling [J].
Zhang, H ;
Li, H ;
Tam, CM .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2006, 20 (02) :141-149
[30]  
Zhuang M., 2004, P ASME 2004 INT DES, P1