Optimal investment strategies for flexible resources, considering pricing and correlated demands

被引:88
作者
Bish, EK [1 ]
Wang, Q [1 ]
机构
[1] Virginia Polytech Inst & State Univ, Grado Dept Ind & Syst Engn, Blacksburg, VA 24061 USA
关键词
D O I
10.1287/opre.1040.0138
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We study the optimal resource investment decision faced by a two-product, price-setting firm that operates in a monopolistic setting and employs a postponed pricing scheme. The firm has the option to invest in dedicated resources as well as a more expensive, flexible resource that can satisfy both products. While the resource investment decision is made under demand uncertainty, pricing and resource allocation decisions are postponed to the time when demand curves are realized. Our analysis provides the structure of the firm's optimal resource investment strategy as a function of demand parameters and investment costs, and shows that the flexible resource investment decision follows a threshold policy. We also show that it can be optimal for the firm to invest in the flexible resource even when demand patterns are perfectly positively correlated. The reason for flexible capacity investment in this case is financial rather than risk pooling. On the other hand, we show that it can be optimal for the firm not to invest in the flexible resource even when demand patterns are perfectly negatively correlated. The flexible resource investment decision in this case depends on the profitability of the two products. Based on our analysis, we provide principles on the firm's optimal resource investment decision.
引用
收藏
页码:954 / 964
页数:11
相关论文
共 23 条
  • [1] Andreou S. A., 1990, Journal of Manufacturing and Operations Management, V3, P5
  • [2] Single-period multiproduct inventory models with substitution
    Bassok, Y
    Anupindi, R
    Akella, R
    [J]. OPERATIONS RESEARCH, 1999, 47 (04) : 632 - 642
  • [3] Bazaraa M. S., 2013, NONLINEAR PROGRAMMIN
  • [4] A review of manufacturing flexibility
    Beach, R
    Muhlemann, AP
    Price, DHR
    Paterson, A
    Sharp, JA
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 122 (01) : 41 - 57
  • [5] BISH EK, 2002, OPTIMAL INVESTMENT S
  • [6] Caulkins J. P., 1990, Annals of Operations Research, V26, P351
  • [7] CHOD J, 2002, RESOURCE FLEXIBILITY
  • [8] Investment and capacity choice under uncertain demand
    Dangl, T
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 117 (03) : 415 - 428
  • [9] Multi-factor dynamic investment under uncertainty
    Eberly, JC
    VanMieghem, JA
    [J]. JOURNAL OF ECONOMIC THEORY, 1997, 75 (02) : 345 - 387
  • [10] OPTIMAL INVESTMENT IN PRODUCT-FLEXIBLE MANUFACTURING CAPACITY
    FINE, CH
    FREUND, RM
    [J]. MANAGEMENT SCIENCE, 1990, 36 (04) : 449 - 466