Multi-objective optimization of HRSG configurations on the steam power plant repowering specifications

被引:44
作者
Naserabad, S. Nikbakht [1 ]
Mehrpanahi, A. [2 ]
Ahmadi, G. [3 ]
机构
[1] Semnan Univ, Dept Mech Engn, Semnan, Iran
[2] Shahid Rajaee Teacher Training Univ, Dept Mech Engn, Tehran, Iran
[3] Islamic Azad Univ, Khomeinishahr Branch, Dept Mech Engn, Esfahan, Iran
关键词
Combined cycle; Steam power plant; HRSG; Exergy efficiency; Sustainability; Repowering; GAS-TURBINE CYCLE; EXERGY ANALYSIS; THERMOECONOMIC OPTIMIZATION; HEAT; MW; EFFICIENCY; IRREVERSIBILITY; PERFORMANCE; REDUCTION; GENERATOR;
D O I
10.1016/j.energy.2018.06.130
中图分类号
O414.1 [热力学];
学科分类号
摘要
Repowering as a formerly-experienced method can be considered as a suitable solution in raising the quantity and quality of generated electricity. The full repowering can provide appropriate solutions for converting the status of existing steam power plants (SPP) to assemblies with acceptable generation quality and reach current world standard levels. In this study, due to the importance of Bandar Abbas steam power plant, in terms of positioning and the amount of generated electricity, full repowering is considered. After modeling and verifying the model, the results of modeling the desired states in performing repowering are presented. Optimization is performed using functions of exergy efficiency and cost of electricity generation, using genetic algorithm method. Finally, the obtained diagram (Pareto Curve) indicates the cost changes based on the exergy efficiency that are effective in deciding on and selecting the desired and appropriate investment state. The results of the multi-objective optimization of repowering with two single-pressure and double-pressure level Heat Recovery Steam Generators (HRSGs) indicate an increase in the exergy efficiency of the plant up to a level above 46%. (C) 2018 Elsevier Ltd. Ail rights reserved.
引用
收藏
页码:277 / 293
页数:17
相关论文
共 54 条
[1]  
Ahmadi GR, 2015, J POWER TECHNOL, V95, P288
[2]   Energy and exergy analyses of partial repowering of a natural gas-fired steam power plant [J].
Ahmadi, Gholamreza ;
Akbari, Omid Ali ;
Zarringhalam, Majid .
INTERNATIONAL JOURNAL OF EXERGY, 2017, 23 (02) :149-168
[3]   Solar parallel feed water heating repowering of a steam power plant: A case study in Iran [J].
Ahmadi, Gholamreza ;
Toghraie, Davood ;
Akbari, Omid Ali .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 77 :474-485
[4]   Evaluation of synchronous execution of full repowering and solar assisting in a 200 MW steam power plant, a case study [J].
Ahmadi, Gholamreza ;
Toghraie, Davood ;
Azimian, Ahmadreza ;
Akbari, Omid Ali .
APPLIED THERMAL ENGINEERING, 2017, 112 :111-123
[5]  
Ahmadi P, 2018, COMP ENERGY SYST, V1, P1085, DOI DOI 10.1016/B978-0-12-809597-3.00135-8
[6]   Exergy, exergoeconomic and environmental analyses and evolutionary algorithm based multi-objective optimization of combined cycle power plants [J].
Ahmadi, Pouria ;
Dincer, Ibrahim ;
Rosen, Marc A. .
ENERGY, 2011, 36 (10) :5886-5898
[7]   Thermodynamic analysis and thermoeconomic optimization of a dual pressure combined cycle power plant with a supplementary firing unit [J].
Ahmadi, Pouria ;
Dincer, Ibrahim .
ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (05) :2296-2308
[8]   Exergoenvironmental analysis and optimization of a cogeneration plant system using Multimodal Genetic Algorithm (MGA) [J].
Ahmadi, Pouria ;
Dincer, Ibrahim .
ENERGY, 2010, 35 (12) :5161-5172
[9]   Energy and exergy analysis of a steam power plant in Jordan [J].
Aijundi, Isam H. .
APPLIED THERMAL ENGINEERING, 2009, 29 (2-3) :324-328
[10]   Evaluation of supply boiler repowering of an existing natural gas-fired steam power plant [J].
Akbari, Omidali ;
Marzban, Ali ;
Ahmadi, Gholamreza .
APPLIED THERMAL ENGINEERING, 2017, 124 :897-910