Cyclic hoist scheduling in large real-life electroplating lines

被引:64
作者
Che, Ada [1 ]
Chu, Chengbin
机构
[1] Northwestern Polytech Univ, Sch Management, Xian 710072, Peoples R China
[2] Univ Technol Troyes, ISTIT, F-10010 Troyes, France
[3] Hefei Univ Technol, Hefei, Anhui, Peoples R China
关键词
hoist scheduling; cyclic scheduling; production systems; electroplating lines;
D O I
10.1007/s00291-006-0040-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses cyclic scheduling of a single hoist in large real-life electroplating lines, where a part visits some processing tanks more than once and multiple duplicate tanks are used at some production stages having long processing times. We present a formal analysis of the problem and propose an efficient branch-and-bound algorithm. The developed analytical properties allow us to considerably eliminate dominated or infeasible solutions in the branch-and-bound procedure. Computational results on benchmark and real-life instances show that the algorithm is very efficient in scheduling large electroplating lines.
引用
收藏
页码:445 / 470
页数:26
相关论文
共 34 条
[1]   A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line [J].
Che, A ;
Chu, CB .
OPERATIONS RESEARCH LETTERS, 2005, 33 (03) :274-284
[2]   Multicyclic hoist scheduling with constant processing times [J].
Che, A ;
Chu, CB ;
Chu, F .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2002, 18 (01) :69-80
[3]   Cyclic scheduling of a hoist with time window constraints [J].
Chen, HX ;
Chu, CB ;
Proth, JM .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1998, 14 (01) :144-152
[4]   Cyclic scheduling of identical parts in a robotic cell [J].
Crama, Y ;
Van de Klundert, J .
OPERATIONS RESEARCH, 1997, 45 (06) :952-965
[5]   Cyclic scheduling in robotic flowshops [J].
Crama, Y ;
Kats, V ;
van de Klundert, J ;
Levner, E .
ANNALS OF OPERATIONS RESEARCH, 2000, 96 (1-4) :97-124
[6]   Sequencing and scheduling in robotic cells: Recent developments [J].
Dawande, M ;
Geismar, HN ;
Sethi, SP ;
Sriskandarajah, C .
JOURNAL OF SCHEDULING, 2005, 8 (05) :387-426
[7]   Scheduling in robotic cells: complexity and steady state analysis [J].
Hall, NG ;
Kamoun, H ;
Sriskandarajah, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (01) :43-65
[8]   The complexity of cyclic shop scheduling problems [J].
Hall, NG ;
Lee, TE ;
Posner, ME .
JOURNAL OF SCHEDULING, 2002, 5 (04) :307-327
[9]  
HALL NG, 1999, HDB IND ROBOTICS, V2, P543
[10]   SCHEDULE EFFICIENCY IN A ROBOTIC PRODUCTION CELL [J].
IOACHIM, I ;
SOUMIS, F .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1995, 7 (01) :5-26