Insertion techniques for static and dynamic resource-constrained project scheduling

被引:196
作者
Artigues, C [1 ]
Michelon, P [1 ]
Reusser, S [1 ]
机构
[1] Lab Informat Avignon, F-84911 Avignon 9, France
关键词
resource-constrained project scheduling; activity-on-node/flow network; activity insertion; robust scheduling; tabu search;
D O I
10.1016/S0377-2217(02)00758-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A flow network model is presented for the static resource-constrained project scheduling problem. Static and dynamic scheduling methods, based on a new polynomial insertion algorithm taking advantage on the flow structure, are proposed. The performed computational experiments on some state-of-the-art problem instances show the potential of this approach. (C) 2003 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:249 / 267
页数:19
相关论文
共 50 条
  • [31] An adaptive memory programming framework for the resource-constrained project scheduling problem
    Paraskevopoulos, Dimitris C.
    Tarantilis, Christos D.
    Ioannou, George
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4938 - 4956
  • [32] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Ma, Weimin
    Che, Yangyang
    Huang, Hu
    Ke, Hua
    INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2016, 7 (04) : 613 - 621
  • [33] An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
    Fang, Chen
    Wang, Ling
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (05) : 890 - 901
  • [34] A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    MATHEMATICS OF OPERATIONS RESEARCH, 2022, 47 (04) : 3156 - 3183
  • [35] A Teaching-Learning-Based Optimization Algorithm for the Resource-Constrained Project Scheduling Problem
    Joshi, Dheeraj
    Mittal, M. L.
    Kumar, Manish
    HARMONY SEARCH AND NATURE INSPIRED OPTIMIZATION ALGORITHMS, 2019, 741 : 1101 - 1109
  • [36] A hybrid framework for over-constrained generalized resource-constrained project scheduling problems
    Lim, A
    Rodrigues, B
    Thangarajoo, R
    Xiao, F
    ARTIFICIAL INTELLIGENCE REVIEW, 2004, 22 (03) : 211 - 243
  • [37] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Weimin Ma
    Yangyang Che
    Hu Huang
    Hua Ke
    International Journal of Machine Learning and Cybernetics, 2016, 7 : 613 - 621
  • [38] Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling
    Bettemir, Onder Halis
    Sonmez, Rifat
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (05)
  • [39] Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining
    Hill, Alessandro
    Brickey, Andrea J.
    Cipriano, Italo
    Goycoolea, Marcos
    Newman, Alexandra
    INFORMS JOURNAL ON COMPUTING, 2022, 34 (06) : 3042 - 3058
  • [40] A two-phase GA model for resource-constrained project scheduling
    Chen, Po-Han
    Weng, Haijie
    AUTOMATION IN CONSTRUCTION, 2009, 18 (04) : 485 - 498