Polynomial Time Approximation Scheme for Two Parallel Machines Scheduling with a Common Due Date to Maximize Early Work

被引:32
作者
Sterna, Malgorzata [1 ]
Czerniachowska, Kateryna [1 ]
机构
[1] Poznan Univ Tech, Inst Comp Sci, Piotrowo 2, PL-60965 Poznan, Poland
关键词
Scheduling; Parallel machines; Early work; Late work; Polynomial time approximation scheme; WEIGHTED LATE WORK; 2-MACHINE FLOW-SHOP; SINGLE-MACHINE; CRITERION; MINIMIZE; PROCESSORS; ALGORITHMS;
D O I
10.1007/s10957-017-1147-7
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We study the scheduling problem with a common due date on two parallel identical machines and the total early work criterion. The problem is known to be NP-hard. We prove a few dominance properties of optimal solutions of this problem. Their proposal was inspired by the results of some auxiliary computational experiments. Test were performed with the dynamic programming algorithm and list algorithms. Then, we propose the polynomial time approximation scheme, based on structuring problem input. Moreover, we discuss the relationship between the early work criterion and the related late work criterion. We compare the computational complexity and approximability of scheduling problems with both mentioned objective functions.
引用
收藏
页码:927 / 944
页数:18
相关论文
共 45 条
  • [1] Minimizing the total weighted late work in scheduling of identical parallel processors with communication delays
    Abasian, Foroogh
    Ranjbar, Mohammad
    Salari, Majid
    Davari, Morteza
    Khatami, Seyed Morteza
    [J]. APPLIED MATHEMATICAL MODELLING, 2014, 38 (15-16) : 3975 - 3986
  • [2] Design of high-performing hybrid meta-heuristics for unrelated parallel machine scheduling with machine eligibility and precedence constraints
    Afzalirad, Mojtaba
    Rezaeian, Javad
    [J]. ENGINEERING OPTIMIZATION, 2016, 48 (04) : 706 - 726
  • [3] Agnetis A., 2014, MULTIAGENT SCHEDULIN
  • [4] Al Zuwaini M.K., 2016, J PROG RES MATH, V7, P907
  • [5] Alon N., 1998, Journal of Scheduling, V1, P55, DOI 10.1002/(SICI)1099-1425(199806)1:1<55::AID-JOS2>3.0.CO
  • [6] 2-J
  • [7] [Anonymous], 1979, Computers and Intractablity: A Guide to the Theory of NP-Completeness
  • [8] A single machine scheduling problem to minimize total early work
    Ben-Yehoshua, Yoav
    Mosheiov, Gur
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2016, 73 : 115 - 118
  • [9] A comparison of solution procedures for two-machine flow shop scheduling with late work criterion
    Blazewicz, J
    Pesch, E
    Sterna, M
    Werner, F
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 49 (04) : 611 - 624
  • [10] MINIMIZING MEAN WEIGHTED EXECUTION TIME LOSS ON IDENTICAL AND UNIFORM PROCESSORS
    BLAZEWICZ, J
    FINKE, G
    [J]. INFORMATION PROCESSING LETTERS, 1987, 24 (04) : 259 - 263