USING SIMULATION WITH DESIGN FOR SIX SIGMA IN A SERVER MANUFACTURING ENVIRONMENT

被引:6
作者
Ramakrishnan, Sreekanth [1 ]
Tsai, Pei-Fang [1 ]
Drayer, Christiana M. [2 ]
Srihari, Krishnaswami [1 ]
机构
[1] SUNY Binghamton, Dept Syst Sci & Ind Engn, POB 6000, Binghamton, NY 13902 USA
[2] IBM Corp, Poughkeepsie, NY 12601 USA
来源
2008 WINTER SIMULATION CONFERENCE, VOLS 1-5 | 2008年
关键词
D O I
10.1109/WSC.2008.4736282
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
This research presents an integrated simulation modeling-Design For Six Sigma (DFSS) framework to study the design and process issues in a server manufacturing environment. The server assembly process is characterized by long cycle times, high fall-out rates and extremely complex assembly operations. To ensure on-time customer delivery, these enterprises adopt a make-to-plan and build-to-order philosophy. However, this model is extremely complex, resulting in wastes and inefficiencies in the associated processes. Lean and six sigma approaches have been successful in improving performance by eliminating waste in the design and operational processes. In this study, an integrated simulation modeling - DFSS framework is proposed to (i) address effects of variation, (ii) assess interactions effects between various sub-systems, and (iii) study proposed process (or design) changes, while performing "what-if" analysis. This framework was then used to identify opportunities for improving the operational and design issues in a server manufacturing environment.
引用
收藏
页码:1904 / +
页数:3
相关论文
共 14 条
  • [1] Production and inventory control of a single product assemble-to-order system with multiple customer classes
    Benjaafar, Saif
    ElHafsi, Mohsen
    [J]. MANAGEMENT SCIENCE, 2006, 52 (12) : 1896 - 1912
  • [2] A simulation-based tool for inventory analysis in a server computer manufacturing environment
    Cao, H
    Cheng, F
    Xi, HF
    Ettl, M
    Buckley, S
    Rodriguez, C
    [J]. PROCEEDINGS OF THE 2003 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2003, : 1313 - 1318
  • [3] Integration of process-oriented tolerancing and maintenance planning in design of multistation manufacturing processes
    Chen, Yong
    Ding, Yu
    Jin, Jionghua
    Ceglarek, Dariusz
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2006, 3 (04) : 440 - 453
  • [4] Cheng F., 2005, A Two-stage Push-pull Production Planning Model, P1
  • [5] Drayer C.M., 2008, Proceedings of the 2008 IIE Annual Conference and Exposition, P685
  • [6] Eldabi T, 2007, PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, P1433
  • [7] Lean sigma and simulation, so what's the correlation? V2
    Ferrin, DM
    Miller, MJ
    Muthler, D
    [J]. Proceedings of the 2005 Winter Simulation Conference, Vols 1-4, 2005, : 2011 - 2015
  • [8] Digital factory -: Semulation enhancing the product and production engineering process
    Kuehn, Wolfgang
    [J]. Proceedings of the 2006 Winter Simulation Conference, Vols 1-5, 2006, : 1899 - 1906
  • [9] Simulation and optimization as effective DFSS tools
    Luce, K
    Trepanier, L
    Ciochetto, F
    Goldman, L
    [J]. Proceedings of the 2005 Winter Simulation Conference, Vols 1-4, 2005, : 1993 - 1999
  • [10] Mead D.J., 2006, Journal of Manufacturing Systems, V25, P1