Critical success factors for PPP infrastructure: perspective from Taiwan

被引:31
作者
Hsueh, Chuen-Ming [1 ]
Chang, Luh-Maan [1 ]
机构
[1] Natl Taiwan Univ, Dept Civil Engn, Taipei, Taiwan
关键词
Public private partnership; critical success factors; independent samples T-test; factor analysis; PUBLIC-PRIVATE PARTNERSHIPS; HONG-KONG; PROJECTS; CHINA;
D O I
10.1080/02533839.2017.1335619
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Taiwan opened up international competitive bidding for its first public private partnership (PPP) project in Oct. 1996, the western corridor High Speed Rail (THSR) project, and the contract was signed in July 1998, which was the largest Build-Operate-Transfer (BOT) project in the world at the time. Then, other PPP projects were launched for improving Taiwan's infrastructure. Based on the statistics provided by Taiwan Ministry of Finance (TMOF), Taiwan then conducted a total of 1217 PPP projects between 2002 and 2014. Many PPP projects are successful. However, studies on the critical success factors for Taiwan's PPP Projects are scant. The purpose of this paper is to present the findings which resulted from a study which aimed to identify & prioritize those factors critically contributing to the success of PPP infrastructure projects in Taiwan and to demonstrate the methodologies used. Four principal groups were extracted via factor analysis. They are: supportive legal frameworks, a favorable investment environment, selection of appropriate PPP projects and public support. Hopefully, the findings and the associated methodologies illustrated in this study can serve as references for successfully conducting PPP infrastructure projects in the future.
引用
收藏
页码:370 / 377
页数:8
相关论文
共 38 条
[1]  
[Anonymous], 2006, MULTIVARIATE DATA AN
[2]  
[Anonymous], 2014, S VLSI TECHN VLSI TE, DOI DOI 10.1002/DMRR.2580
[3]  
[Anonymous], 2008, PRACT GUID GOOD GOV
[4]  
[Anonymous], CONSTRUCTION MANAGEM
[5]  
[Anonymous], 2001, BEHAV CHANGE, DOI DOI 10.1375/BECH.18.1.58
[6]  
BARTLETT MS, 1954, J ROY STAT SOC B, V16, P296
[7]  
Cattell R. B, 1978, SCI USE FACTOR ANAL, DOI [10.1007/978-1-4684-2262-7, DOI 10.1007/978-1-4684-2262-7]
[8]   Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective [J].
Chan, Albert P. C. ;
Lam, Patrick T. I. ;
Chan, Daniel W. M. ;
Cheung, Esther ;
Ke, Yongjian .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) :484-494
[9]   Drivers for Adopting Public Private Partnerships-Empirical Comparison between China and Hong Kong Special Administrative Region [J].
Chan, Albert P. C. ;
Lam, Patrick T. I. ;
Chan, Daniel W. M. ;
Cheung, Esther ;
Ke, Yongjian .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (11) :1115-1124
[10]   BOT financial model: Taiwan high speed rail, case [J].
Chang, LM ;
Chen, PH .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (03) :214-222