Assignment and sequencing of parts to autonomous workstations

被引:0
作者
Lucertini, M [1 ]
Nicolò, F
Smriglio, S
机构
[1] Univ Roma Tor Vergata, Dipartimento Informat Sistemi & Prod, I-00173 Rome, Italy
[2] Univ Roma Tre, Dipartimento Automat & Informat, Rome, Italy
[3] Univ Aquila, Dept Matemat Pura & Applicata, I-67100 Laquila, Italy
来源
CONTROL AND CYBERNETICS | 2000年 / 29卷 / 01期
关键词
bipartite matching; polynomial-time algorithm; distributed algorithm; coordination mechanism;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We present an optimization-based coordination protocol among autonomous workstations in a multiprocessor stage devoted to painting of the shutters in a furniture production process. The coordination aims to maximize the number of parallel operations executable at each machine cycle, while fulfilling constraints on the unique-copy tools. The mechanism is derived by a distributed implementation of a bipartite matching algorithm. The resulting procedure is shown to be compatible with the several autonomous decisions characterizing the process.
引用
收藏
页码:221 / 236
页数:16
相关论文
共 13 条
[1]  
ADACHER L, 1999, IN PRESS IEE T DESIG
[2]  
ARBIB C, 1999, 14 U AQ DIP MAT PUR
[3]  
DECKER KS, 1994, COMMUNICATION SERVIC
[4]   CELLULAR CONTROL OF MANUFACTURING SYSTEMS [J].
DELLACROCE, F ;
MENGA, G ;
TADEI, R ;
CAVALOTTO, M ;
PETRI, L .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 69 (03) :498-509
[5]  
GERARDS B, 1995, HDB OPERATIONS RES M
[6]  
GOU L, 1997, IEEE ASME INT C ADV
[7]  
GOU L, 1994, P 4 RENSS INT C COMP
[8]  
GRAVES SC, 1982, MANAGE SCI, V28, P3
[9]   2-COMMODITY FLOW [J].
ITAI, A .
JOURNAL OF THE ACM, 1978, 25 (04) :596-611
[10]   INTEGRATED SHOP FLOOR CONTROL USING AUTONOMOUS AGENTS [J].
LIN, GYJ ;
SOLBERG, JJ .
IIE TRANSACTIONS, 1992, 24 (03) :57-71