Monitoring of the Alamillo cable-stayed bridge during construction

被引:17
作者
Casas, JR [1 ]
Aparicio, AC [1 ]
机构
[1] Tech Univ Catalunya, Sch Civil Engn, Barcelona 08034, Spain
关键词
cable-stayed bridge; bridge monitoring; segmental construction; instrumentation; model updating; vibration testing;
D O I
10.1007/BF02321263
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Alamillo Bridge is one of the long-span bridges crossing the Guadalquivir River. It was built on the occasion of Expo '92 in 1992 in Sevilla, Spain. The bridge is a cable-stayed structure spanning 200 m without any intermediate supports. Its originality is the lack of back stays and the balancing of the front stays through the backward inclination of a massive pylon. This paper shows the importance of experimental in situ techniques when applied to unconventional civil engineering structures and how-with the help of an important amount of accurate instrumentation, monitoring the most important experimental variables-it was possible to build the bridge correctly, safely, and on schedule.
引用
收藏
页码:24 / 28
页数:5
相关论文
共 4 条
[1]  
APARICO AC, 18 REG GOV AND TU CA
[2]  
Casas J.R., 1994, Struct Eng Int, V4, P235, DOI [10.2749/101686694780601700, DOI 10.2749/101686694780601700]
[3]   FULL-SCALE DYNAMIC TESTING OF THE ALAMILLO CABLE-STAYED BRIDGE IN SEVILLE (SPAIN) [J].
CASAS, JR .
EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1995, 24 (01) :35-51
[4]  
CASAS JR, 1993, P 2 EUR C STRUCT DYN, P995