Public versus Private Perceptions on Hiring an External Program Manager

被引:9
作者
Rasdorf, William [1 ]
Grasso, Barton [2 ]
Bridgers, Mark [3 ]
机构
[1] N Carolina State Univ, Dept Civil Construct & Environm Engn, Raleigh, NC 27695 USA
[2] Bennett & Associates, Houston, TX 77056 USA
[3] FMI Corp, Raleigh, NC 27612 USA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2010年 / 136卷 / 02期
关键词
Construction; Management; Construction management; Owners; Organizations; Surveys; Capital improvement;
D O I
10.1061/(ASCE)0733-9364(2010)136:2(219)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As construction industry service providers have expanded their service offerings to meet the demands of construction owners, new management techniques have evolved. One of these management techniques, program management, has emerged as a service offering that covers all aspects of the construction life cycle. This paper reviews specific topics related to the hiring of an external program management service provider, including fees, types of firms, factors considered, and organizational models. Each of these topics was addressed in a recent survey of nonresidential construction industry owners. The survey results are first presented for all respondents and are then segregated by sector (public and private sector respondents). It is apparent that the use of program management firms is still lacking in comparison to the use of other firms and service providers and that construction owners typically use an organizational model that allows them to retain control of their construction program, which true external program management does not. Also, the survey results showed differences between the public and private sectors in the factors considered when hiring a program manager. Because program management is the ultimate form of outsourcing, it is both a particularly timely topic and a topic that is very relevant to construction professionals.
引用
收藏
页码:219 / 226
页数:8
相关论文
共 11 条
[1]  
BRIDGERS M, 2006, FMI CMAA 7 ANN SURVE
[2]  
*CMAA, 2008, WHAT IS CONSTR MAN
[3]  
*DAT, 2006, CONSTR ENG US IND PR
[4]   Survey of the construction industry relative to the use of CPM scheduling for construction projects [J].
Galloway, Patricia D. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (07) :697-711
[5]   CHOOSING APPROPRIATE CONSTRUCTION CONTRACTING METHOD [J].
GORDON, CM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (01) :196-210
[6]   Nature and Extent of Domestic Construction Program Outsourcing [J].
Grasso, Barton ;
Rasdorf, William ;
Bridgers, Mark .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (12) :1002-1010
[7]  
HANSEN K, 2005, P CONSTR RES C ASCE
[8]  
KENIG M, 2004, PROJECT DELIVERY SYS, P3
[9]   Constructing relationally integrated teams [J].
Kumaraswamy, MM ;
Ling, FYY ;
Rahman, MM ;
Phng, ST .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (10) :1076-1086
[10]  
Simonson K., 2006, Quick facts about the construction industry