共 10 条
[1]
Benayoun R., 1966, 49 SEMAMETRA INT, V49
[2]
The Use of Artificial Neural Networks for Residential Buildings Conceptual Cost Estimation
[J].
11TH INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2013, PTS 1 AND 2 (ICNAAM 2013),
2013, 1558
:1302-1306
[3]
Korytarova J., PROCEDIA ENG, V123, P276
[4]
Bid Assessment with the Use of Fuzzy Sets Theory
[J].
PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2014 (ICNAAM-2014),
2015, 1648
[6]
The Application of Artificial Neural Networks in Indirect Cost Estimation
[J].
11TH INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2013, PTS 1 AND 2 (ICNAAM 2013),
2013, 1558
:1312-1315
[7]
Nowak M., 2004, METODY ELECT DETERMI, P35
[8]
The Case-Based Reasoning Model Of Cost Estimation At The Preliminary Stage Of A Construction Project
[J].
INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBLE APPROACH,
2015, 122
:57-64
[9]
The Use of Fuzzy Case-Based Reasoning in Estimating Costs in the Early Phase of the Construction Project
[J].
PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2014 (ICNAAM-2014),
2015, 1648
[10]
The Concept of Investment Decision Suport Model using Fuzzy Set Theory
[J].
11TH INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2013, PTS 1 AND 2 (ICNAAM 2013),
2013, 1558
:1307-1311