A rutting-based optimum maintenance decision strategy of hot in-place recycling in semi-rigid base asphalt pavement

被引:17
作者
Pan, Yuanyuan [1 ]
Liu, Guoqiang [1 ]
Tang, Dong [1 ]
Han, Dongdong [1 ]
Li, Xuanguo [2 ]
Zhao, Yongli [1 ]
机构
[1] Southeast Univ, Sch Transportat, Nanjing 211189, Jiangsu, Peoples R China
[2] Changjiang Inst Survey Planning Design & Res, Wuhan 430010, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Sustainable maintenance management; Hot in-place recycling; Rutting; Maintenance section and maintenance timing; Multi-objective optimization method; The peak cutting method; PERFORMANCE; LIFE;
D O I
10.1016/j.jclepro.2021.126663
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Hot in-place recycling (HIR), 100% recycling reclaimed asphalt pavement (RAP) directly on a construction site, has been widely used as a sustainable maintenance treatment. Since the RAP provides aged asphalt and dense skeleton structure, the HIR is beneficial to restoring pavement rutting resistance. With ever-increasing maintenance requirements whereas limited maintenance budgets, a rutting-based optimum maintenance decision strategy of hot in-place recycling in semi-rigid base asphalt pavement is proposed. It contains the selection of maintenance sections using the peak cutting method in a multi-objective optimization model and the determination of maintenance timing by the arching depth rather than long-term pavement performance. To verify, a case study based on a HIR project of an existing expressway in Jiangsu Province in China is conducted. Results confirms the economy and effectiveness of the peak cutting method in selecting maintenance sections by comparison with the traditional empirical method. With the finite element simulation, the arching depth is proved as the dominant factor of the temperature of asphalt mixtures in milling process. Based on the confidence level of milling temperature, maintenance timing related threshold of arching depth are recommended. Consequently, the proposed maintenance decision strategy could provide the highway management department with guidance in selecting maintenance sections and determining maintenance timing at a critical pre-requisite of saving maintenance funds and restoring pavement serviceability. (C) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页数:12
相关论文
共 32 条
  • [1] ARA INC. ERES Consultants Division, 2004, GUID MECH EMP DES NE, P1
  • [2] Case study: performance effectiveness and cost-benefit analyses of open-graded friction course pavements in Tennessee
    Chen, Xueqin
    Zhu, Hehua
    Dong, Qiao
    Huang, Baoshan
    [J]. INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2017, 18 (11) : 957 - 970
  • [3] Evaluation of Effectiveness and Cost-Effectiveness of Asphalt Pavement Rehabilitations Utilizing LTPP Data
    Dong, Qiao
    Huang, Baoshan
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING, 2012, 138 (06) : 681 - 689
  • [4] Han D.-D., 2019, STUDY SIMULATION CON
  • [5] Heating process monitoring and evaluation of hot in-place recycling of asphalt pavement using infrared thermal imaging
    Han, Dongdong
    Zhao, Yongli
    Pan, Yuanyuan
    Liu, Guoqiang
    Yang, Tao
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 111 (111)
  • [6] Hibbitte K.S., 2005, ABAQUS ANAL USERS MA
  • [7] LCA and LCCA based multi-objective optimization of pavement maintenance
    Huang, Mengyu
    Dong, Qiao
    Ni, Fujian
    Wang, Liyuan
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 283
  • [8] Hui, 2013, FAILURE PATTERN RECO
  • [9] Determining the Service Life of Thin Hot-Mix Asphalt Overlay by Means of Different Performance Indicators
    Irfan, Muhammad
    Khurshid, Muhammad Bilal
    Labi, Samuel
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2108) : 37 - 45
  • [10] JBQTS Jiangsu Bureau of Quality and Technical Supervision, 2016, DB32T31342016 JBQTS