共 50 条
- [1] Multi-stage performance upgrade of steel moment frames by post-tension connections International Journal of Engineering, Transactions B: Applications, 2021, 34 (05): : 1132 - 1144
- [2] Seismic performance of moment connections in steel moment frames with HSS columns STEEL AND COMPOSITE STRUCTURES, 2017, 25 (03): : 271 - 286
- [3] Steel moment frames with welded connections BUILDING AN INTERNATIONAL COMMUNITY OF STRUCTURAL ENGINEERS, VOLS 1 AND 2, 1996, : 1115 - 1122
- [4] Post-earthquake stability of steel moment frames with damaged connections CONNECTIONS IN STEEL STRUCTURES III: BEHAVIOUR, STRENGTH AND DESIGN, 1996, : 391 - 402
- [8] Repair/upgrade of steel moment frames in low rise buildings ADVANCES IN STEEL STRUCTURES, VOLS I & II, PROCEEDINGS, 2002, : 221 - 228
- [9] Probabilistic modeling of steel moment frames with welded connections ENGINEERING JOURNAL-AMERICAN INSTITUTE OF STEEL CONSTRUCTION INC, 1999, 36 (03): : 121 - 128
- [10] Seismic performance evaluation of steel moment resisting frames with WUF-B connections 2008 SEISMIC ENGINEERING CONFERENCE COMMEMORATING THE 1908 MESSINA AND REGGIO CALABRIA EARTHQUAKE, PTS 1 AND 2, 2008, 1020 : 1871 - 1878