An improved stochastic programming model for supply chain planning of MRO spare parts

被引:19
作者
Li, Ling [1 ,2 ]
Liu, Min [1 ]
Shen, Weiming [1 ]
Cheng, Guoqing [2 ]
机构
[1] Tongji Univ, Dept Elect & Informat Engn, Shanghai 201804, Peoples R China
[2] Jingdezheng Ceram Inst, Dept Informat Engn, Jingdezheng 333403, Peoples R China
基金
中国国家自然科学基金;
关键词
Supply chain management planning; Spare parts; Stochastic programming; Multi-choice programming; Probability density function; MARKOV DECISION-PROCESSES; INVENTORY MANAGEMENT; MAINTENANCE; DEMAND; UNCERTAINTY; ALLOCATION; SYSTEMS; MULTIECHELON; CONSTRAINTS; INFORMATION;
D O I
10.1016/j.apm.2017.03.031
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The maintenance, repair and operation (MRO) spare parts that are vital to machine operations are playing an increasingly important role in manufacturing enterprises. MRO spare parts supply chain management planning must be coordinated to ensure spare part availability while keeping the total cost to a minimum. Due to the specificity of MRO spare parts, randomness and uncertainties in production and storage should be quantified to formulate the problem in a mathematical model. Given these considerations, this paper proposes an improved stochastic programming model for the supply chain planning of MRO spare parts. In our stochastic programming model, the following improvements are made: First, we quantify the uncertain production time capacity as a random variable with a probability distribution. Second, the upper bound of the storage cost is modeled as a multi-choice variable in the constraint. To derive the equivalent deterministic model, the Lagrange interpolating polynomial approach is used. The results of the numerical examples validate the feasibility and efficiency of the proposed model. Finally, the model is tested in the supply chain planning of continuous caster (CC) bearings. (C) 2017 Published by Elsevier Inc.
引用
收藏
页码:189 / 207
页数:19
相关论文
共 35 条
[21]   Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem [J].
Lee, Loo Hay ;
Chew, Ek Peng ;
Teng, Suyan ;
Chen, Yankai .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (02) :476-491
[22]   A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand [J].
Levner, Eugene ;
Perlman, Yael ;
Cheng, T. C. E. ;
Levner, Ilya .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 132 (01) :43-51
[23]  
Li Ling, 2016, Computer Integrated Manufacturing Systems, V22, P70, DOI 10.13196/j.cims.2016.01.007
[24]   A Discrete Stress-Strength Interference Theory-Based Dynamic Supplier Selection Model for Maintenance Service Outsourcing [J].
Li, Ling ;
Liu, Min ;
Shen, Weiming ;
Cheng, Guoqing .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2016, 63 (02) :189-200
[25]   The inventory management system for automobile spare parts in a central warehouse [J].
Li, S. G. ;
Kuo, X. .
EXPERT SYSTEMS WITH APPLICATIONS, 2008, 34 (02) :1144-1153
[26]   A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times [J].
Nosoohi, Iman ;
Hejazi, Seyed Reza .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (03) :1157-1166
[27]   On the demand distributions of spare parts [J].
Syntetos, A. A. ;
Babai, M. Z. ;
Altay, N. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (08) :2101-2117
[28]   Dynamic demand fulfillment in spare parts networks with multiple customer classes [J].
Tiemessen, H. G. H. ;
Fleischmann, M. ;
van Houtum, G. J. ;
van Nunen, J. A. E. E. ;
Pratsini, E. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 228 (02) :367-380
[29]   A framework for maintenance concept development [J].
Waeyenbergh, G ;
Pintelon, L .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 77 (03) :299-313
[30]   Slab scheduling at parallel continuous casters [J].
Wichmann, Matthias Gerhard ;
Spengler, Thomas Stefan .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 170 :551-562