Study of Accelerated Production of Prestressed Concrete Sleepers using Strut-and-Tie Model

被引:0
作者
Tantipidok, Patarapol [1 ]
McLaughlin, Dinara [1 ]
Stemberk, Petr [1 ]
机构
[1] Czech Tech Univ, Prague 16629 6, Czech Republic
来源
SPECIAL CONCRETE AND COMPOSITES 2014 | 2014年 / 1054卷
关键词
Strut-and-tie model; prestressed concrete sleeper; accelerated production; early-age concrete; formwork removal; transmission length;
D O I
10.4028/www.scientific.net/AMR.1054.122
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
When designing the technological process for producing prestressed concrete sleepers on a large scale, it is especially important to achieve substantial reduction of production time due to the economic aspect. In this study, an estimation of the earliest possible time to release prestressing force from the wire with respect to bond development is presented, thus, allowing earlier removal and reuse of a prestressed concrete sleeper formwork. Time-dependent development of concrete compressive and tensile strength is defined according to fib Model Code 2010. A Strut-and-Tie Model has been adapted as a design method for establishing the transmission length required for anchoring prestressed wires in a prestressed concrete sleeper in accordance with the bond stress. Additional calculations have established that the method is consistent with the Eurocode approach.
引用
收藏
页码:122 / 127
页数:6
相关论文
共 6 条
[1]  
[Anonymous], 2004, 199211 UNI EN
[2]  
[Anonymous], 2006, 10138 PREN 2
[3]   Bond modelling of prestressed concrete during the prestressing force release [J].
Benitez, Jose M. ;
Galvez, Jaime C. .
MATERIALS AND STRUCTURES, 2011, 44 (01) :263-278
[4]  
European Committee for Standardization (CEN), 2002, 13230 EN
[5]  
Federation internationale du beton (fib), 2012, fib Bulletin, V65/66
[6]  
Stemberk P, 2011, MECKA, P287