共 73 条
[1]
[Anonymous], 2005, GUIDANCE CALCULATION
[2]
Asad R, 2012, ASIA-PAC POWER ENERG
[3]
Assocham India, 2018, EL MOB IND LEV COLL
[4]
Bansal H.O, 2016, INT J VEH TECHNOL, V8, P212
[6]
Finding knees in multi-objective optimization
[J].
PARALLEL PROBLEM SOLVING FROM NATURE - PPSN VIII,
2004, 3242
:722-731
[7]
Browne M., 2015, Green Logistics. Improving the Environmental Sustainability of Logistics, V3rd
[8]
Chekired DA, 2017, INT WIREL COMMUN, P1010, DOI 10.1109/IWCMC.2017.7986424
[10]
A NSGA-II and NSGA-III comparison for solving an open shop scheduling problem with resource constraints
[J].
IFAC PAPERSONLINE,
2016, 49 (12)
:1272-1277