Comparative evaluation of MILP flowshop models

被引:66
作者
Stafford, EF [1 ]
Tseng, FT
Gupta, JND
机构
[1] Univ Alabama, Dept Econ & Finance, Huntsville, AL 35899 USA
[2] Univ Alabama, Dept Accounting & Management Informat Syst, Huntsville, AL USA
关键词
flowshop scheduling; integer programming; model complexity; empirical evaluation; Wagner models; Manne models;
D O I
10.1057/palgrave.jors.2601805
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates the performance of two families of mixed-integer linear programing (MILP) models for solving the regular permutation flowshop problem to minimize makespan. The three models of the Wagner family incorporate the assignment problem while the five members of the Manne family use pairs of dichotomous constraints, or their mathematical equivalents, to assign jobs to sequence positions. For both families, the problem size complexity and computational time required to optimally solve a common set of problems are investigated. In so doing, this paper extends the application of MILP approaches to larger problem sizes than those found in the existing literature. The Wagner models require more than twice the binary variables and more real variables than do the Manne models, while Manne models require more constraints for the same sized problems. All Wagner models require much less computational time than any of the Manne models for solving the common set of problems, and these differences increase dramatically with increasing number of jobs and machines. Wagner models can solve problems containing larger numbers of machines and jobs than the Manne models, and hence are preferable for finding optimal solutions to the permutation. owshop problem with makespan objective.
引用
收藏
页码:88 / 101
页数:14
相关论文
共 35 条
[1]  
Aggarwal S. C., 1975, Decision Sciences, V6, P237, DOI 10.1111/j.1540-5915.1975.tb01016.x
[2]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[3]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[4]   THE SCHEDULE-SEQUENCING PROBLEM [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1959, 7 (05) :621-624
[5]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[6]  
Chen B, 1998, Handbook of combinatorial optimization, P1493, DOI [DOI 10.1007/978-1-4613-0303-9_25, 10.1007/978-1-4613-0303-9_25]
[7]  
GUPTA JND, 1979, DISAGGREGATION PROBL, P363, DOI [DOI 10.1007/978-94-015-7636-9_23, 10.1007/978-94-015-7636-9_23]
[8]  
Hollander M, 1973, Nonparametric Statistical Methods, P11437
[9]  
*IBM, 1979, MATH PROGR SYST EXT
[10]  
ILOG SA, 2001, ILOG CPLEX 7 1 USERS