Heuristics for the mixed no-idle flowshop with sequence-dependent setup times

被引:10
作者
Rossi, Fernando Luis [1 ]
Nagano, Marcelo Seido [2 ]
机构
[1] Fed Inst Sao Paulo, Management Dept, Sao Paulo, SP, Brazil
[2] Univ Sao Paulo, Sao Carlos Sch Engn, Dept Ind Engn, Sao Carlos, SP, Brazil
关键词
Flowshop; no-idle; setup time; heuristics; Makespan; ITERATED GREEDY ALGORITHM; HIGH-PERFORMING HEURISTICS; SHOP SCHEDULING PROBLEMS; PERMUTATION FLOWSHOP; TOTAL TARDINESS; CONSTRUCTIVE HEURISTICS; DIFFERENTIAL EVOLUTION; OPTIMIZATION ALGORITHM; MAKESPAN MINIMIZATION; FLOWTIME MINIMIZATION;
D O I
10.1080/01605682.2019.1671149
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, the mixed no-idle flowshop scheduling problem with sequence-dependent setup times and makespan minimisation criterion is studied. The mixed no-idle flowshop problem considers an environment in which regular machines coexist with stages that require an uninterrupted process. We address an extension of the mixed no-idle problem which considers sequence-dependent setup times on idle machines. To the best of our knowledge, this problem has not yet been studied in the literature although it can be found in the dynamics of productive systems. We also present a mathematical formulation for this new problem and a constructive heuristic is proposed. In addition, two extensive new benchmarks were developed based on a well-known set of problems from the literature. A comprehensive statistical and computational experiment was performed with state-of-the-art constructive heuristics and our proposed method. The results show that the new heuristic outperformed the methods from the literature.
引用
收藏
页码:417 / 443
页数:27
相关论文
共 94 条
[1]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[2]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[3]   The significance of reducing setup times/setup costs [J].
Allahverdi, Ali ;
Soroush, H. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :978-984
[4]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[5]  
Baptiste P., 1997, P INT C IND ENG PROD, V97, P429
[6]   A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time [J].
Baraz, Daniel ;
Mosheiov, Gur .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (02) :810-813
[7]   Two simple and effective heuristics for minimizing the makespan in non-permutation flow shops [J].
Benavides, Alexander J. ;
Ritt, Marcus .
COMPUTERS & OPERATIONS RESEARCH, 2016, 66 :160-169
[8]   Improving the migrating birds optimization metaheuristic for the permutation flow shop with sequence-dependent set-up times [J].
Benkalai, Imene ;
Rebaine, Djamal ;
Gagne, Caroline ;
Baptiste, Pierre .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) :6145-6157
[9]   The migrating birds optimization metaheuristic for the permutation flow shop with sequence dependent setup times [J].
Benkalai, Imene ;
Rebaine, Djamal ;
Gagne, Caroline ;
Baptiste, Pierre .
IFAC PAPERSONLINE, 2016, 49 (12) :408-413
[10]   2 MACHINE FLOW SHOP SCHEDULING PROBLEMS WITH SEQUENCE DEPENDENT SETUP TIMES - DYNAMIC-PROGRAMMING APPROACH [J].
CORWIN, BD ;
ESOGBUE, AO .
NAVAL RESEARCH LOGISTICS, 1974, 21 (03) :515-524